{"id":991302,"date":"2026-02-12T14:31:38","date_gmt":"2026-02-12T14:31:38","guid":{"rendered":"https:\/\/ukpostcode.org\/content\/?p=991302"},"modified":"2026-02-12T14:31:38","modified_gmt":"2026-02-12T14:31:38","slug":"nadara-selects-zx-lidars-for-uk-wind-repowering-programme","status":"publish","type":"post","link":"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/","title":{"rendered":"Nadara Selects ZX Lidars for UK Wind Repowering Programme"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_73 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Nadara_Selects_ZX_Lidars_for_UK_Wind_Repowering_Programme_%E2%80%94_Full_Details\" title=\"Nadara Selects ZX Lidars for UK Wind Repowering Programme \u2014 Full Details\">Nadara Selects ZX Lidars for UK Wind Repowering Programme \u2014 Full Details<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#What_the_Agreement_Covers\" title=\"What the Agreement Covers\">What the Agreement Covers<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Why_Repowering_Matters_Now\" title=\"Why Repowering Matters Now\">Why Repowering Matters Now<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Role_of_ZX_300e_LiDAR_Technology\" title=\"Role of ZX 300e LiDAR Technology\">Role of ZX 300e LiDAR Technology<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Strategic_Goals_for_Nadara\" title=\"Strategic Goals for Nadara\">Strategic Goals for Nadara<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#What_This_Means_for_the_Wind_Industry\" title=\"What This Means for the Wind Industry\">What This Means for the Wind Industry<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Bottom_Line\" title=\"Bottom Line\">Bottom Line<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Nadara_Selects_ZX_Lidars_for_UK_Wind_Repowering_Programme_%E2%80%94_Case_Studies_Commentary\" title=\"Nadara Selects ZX Lidars for UK Wind Repowering Programme \u2014 Case Studies &amp; Commentary\">Nadara Selects ZX Lidars for UK Wind Repowering Programme \u2014 Case Studies &amp; Commentary<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Case_Study_1_%E2%80%94_Reducing_Financial_Risk_With_Bankable_Wind_Data\" title=\"Case Study 1 \u2014 Reducing Financial Risk With Bankable Wind Data\">Case Study 1 \u2014 Reducing Financial Risk With Bankable Wind Data<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Situation\" title=\"Situation\">Situation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Intervention\" title=\"Intervention\">Intervention<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Impact\" title=\"Impact\">Impact<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Result\" title=\"Result\">Result<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Case_Study_2_%E2%80%94_Repowering_Instead_of_New_Site_Development\" title=\"Case Study 2 \u2014 Repowering Instead of New Site Development\">Case Study 2 \u2014 Repowering Instead of New Site Development<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Situation-2\" title=\"Situation\">Situation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Strategy\" title=\"Strategy\">Strategy<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Role_of_ZX_Lidars\" title=\"Role of ZX Lidars\">Role of ZX Lidars<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Real-world_effect\" title=\"Real-world effect\">Real-world effect<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Case_Study_3_%E2%80%94_Choosing_the_Right_Turbine_Model\" title=\"Case Study 3 \u2014 Choosing the Right Turbine Model\">Case Study 3 \u2014 Choosing the Right Turbine Model<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Problem\" title=\"Problem\">Problem<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#How_LiDAR_helps\" title=\"How LiDAR helps\">How LiDAR helps<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Decision_improvement\" title=\"Decision improvement\">Decision improvement<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Case_Study_4_%E2%80%94_Accelerating_Project_Approval\" title=\"Case Study 4 \u2014 Accelerating Project Approval\">Case Study 4 \u2014 Accelerating Project Approval<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Challenge\" title=\"Challenge\">Challenge<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Evidence_provided_by_LiDAR\" title=\"Evidence provided by LiDAR\">Evidence provided by LiDAR<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Outcome\" title=\"Outcome\">Outcome<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Case_Study_5_%E2%80%94_Long-Term_Operations_Optimization\" title=\"Case Study 5 \u2014 Long-Term Operations Optimization\">Case Study 5 \u2014 Long-Term Operations Optimization<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#After_construction\" title=\"After construction\">After construction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-29\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Benefit\" title=\"Benefit\">Benefit<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-30\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Commentary_%E2%80%94_What_This_Deal_Signals\" title=\"Commentary \u2014 What This Deal Signals\">Commentary \u2014 What This Deal Signals<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-31\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#1_Repowering_Is_the_Next_Growth_Phase_of_Wind_Energy\" title=\"1. Repowering Is the Next Growth Phase of Wind Energy\">1. Repowering Is the Next Growth Phase of Wind Energy<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-32\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#2_Measurement_Technology_Is_Now_Financial_Infrastructure\" title=\"2. Measurement Technology Is Now Financial Infrastructure\">2. Measurement Technology Is Now Financial Infrastructure<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-33\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#3_Digitalisation_of_Renewables\" title=\"3. Digitalisation of Renewables\">3. Digitalisation of Renewables<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-34\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#4_UK_Market_Implications\" title=\"4. UK Market Implications\">4. UK Market Implications<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-35\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#Final_Insight\" title=\"Final Insight\">Final Insight<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Nadara_Selects_ZX_Lidars_for_UK_Wind_Repowering_Programme_%E2%80%94_Full_Details\"><\/span>Nadara Selects ZX Lidars for UK Wind Repowering Programme \u2014 Full Details<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>&nbsp;<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"What_the_Agreement_Covers\"><\/span>What the Agreement Covers<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The deal involves the <strong>supply of a fleet of ZX 300e wind LiDAR units<\/strong> delivered under a full turnkey model, including:<\/p>\n<ul>\n<li>Field services and operational support from <strong>ZX Measurement Services<\/strong><\/li>\n<li>Dedicated <strong>ZX Power systems<\/strong> for long-term standalone operation<\/li>\n<li>Continuous wind measurement at future turbine hub heights (<a title=\"Nadara Selects ZX 300e Wind Lidar for UK Repowering Program\" href=\"https:\/\/www.powerinfotoday.com\/news-press-releases\/nadara-selects-zx-300e-wind-lidar-for-uk-repowering-program\/?utm_source=chatgpt.com\">Power Info Today<\/a>)<\/li>\n<\/ul>\n<p>These LiDAR units will provide <strong>direct, bankable wind data<\/strong> \u2014 meaning developers and investors can rely on measured conditions rather than assumptions or legacy datasets. (<a title=\"Nadara Selects ZX 300e Wind Lidar for UK Repowering Program\" href=\"https:\/\/www.powerinfotoday.com\/news-press-releases\/nadara-selects-zx-300e-wind-lidar-for-uk-repowering-program\/?utm_source=chatgpt.com\">Power Info Today<\/a>)<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Why_Repowering_Matters_Now\"><\/span>Why Repowering Matters Now<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The UK onshore wind sector is entering a critical phase:<\/p>\n<ul>\n<li>Many wind farms are approaching or exceeding their ~25-year design life (<a title=\"Nadara launches new campaign that puts repowering at the heart of 2030 cleaner power goals - Nadara\" href=\"https:\/\/nadara.com\/media-centre\/nadara-launches-new-campaign-that-puts-repowering-at-the-heart-of-2030-cleaner-power-goals\/?utm_source=chatgpt.com\">Nadara<\/a>)<\/li>\n<li>Planning and land constraints favour upgrading existing sites instead of building new ones (<a title=\"Nadara Selects ZX 300e Wind Lidar for UK Repowering Program\" href=\"https:\/\/www.powerinfotoday.com\/news-press-releases\/nadara-selects-zx-300e-wind-lidar-for-uk-repowering-program\/?utm_source=chatgpt.com\">Power Info Today<\/a>)<\/li>\n<li>New turbines are taller and have larger rotors, requiring measurements at higher altitudes (<a title=\"Windtech International - Nadara selects ZX Lidars ZX 300e wind lidar fleet for UK wind repowering programme\" href=\"https:\/\/www.windtech-international.com\/projects-and-contracts\/nadara-selects-zx-lidars-zx-300e-wind-lidar-fleet-for-uk-wind-repowering-programme?utm_source=chatgpt.com\">windtech-international.com<\/a>)<\/li>\n<\/ul>\n<p>Repowering replaces older turbines with modern ones capable of producing <strong>3\u201310\u00d7 more electricity<\/strong> while reusing infrastructure such as roads and grid connections. (<a title=\"Repowering - Nadara\" href=\"https:\/\/nadara.com\/repowering?utm_source=chatgpt.com\">Nadara<\/a>)<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Role_of_ZX_300e_LiDAR_Technology\"><\/span>Role of ZX 300e LiDAR Technology<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Traditional wind assessments relied heavily on meteorological masts and historic SCADA data \u2014 often inadequate for modern turbine heights.<\/p>\n<p>The <strong>ZX 300e<\/strong> addresses this by:<\/p>\n<ul>\n<li>Measuring wind across <strong>21 m\u2013200 m heights<\/strong><\/li>\n<li>Delivering <strong>IEC 61400-50-2 classification with 0% standard uncertainty<\/strong><\/li>\n<li>Capturing wind shear, veer, and vertical wind profiles<\/li>\n<li>Increasing lender and investor confidence in project output forecasts (<a title=\"Nadara Selects ZX 300e Wind Lidar for UK Repowering Program\" href=\"https:\/\/www.powerinfotoday.com\/news-press-releases\/nadara-selects-zx-300e-wind-lidar-for-uk-repowering-program\/?utm_source=chatgpt.com\">Power Info Today<\/a>)<\/li>\n<\/ul>\n<p>In repowering projects, accurate measurements directly affect financial modelling such as <strong>P50 and P90 energy yield projections<\/strong>. (<a title=\"Nadara Selects ZX 300e Wind Lidar for UK Repowering Program\" href=\"https:\/\/www.powerinfotoday.com\/news-press-releases\/nadara-selects-zx-300e-wind-lidar-for-uk-repowering-program\/?utm_source=chatgpt.com\">Power Info Today<\/a>)<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Strategic_Goals_for_Nadara\"><\/span>Strategic Goals for Nadara<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>According to the company, repowering is central to its long-term UK strategy:<\/p>\n<ul>\n<li>Maximise generation from existing wind sites<\/li>\n<li>Support clean-energy and decarbonisation targets<\/li>\n<li>Enable investment-ready projects with lower uncertainty (<a title=\"Nadara Selects ZX 300e Wind Lidar for UK Repowering Program\" href=\"https:\/\/www.powerinfotoday.com\/news-press-releases\/nadara-selects-zx-300e-wind-lidar-for-uk-repowering-program\/?utm_source=chatgpt.com\">Power Info Today<\/a>)<\/li>\n<\/ul>\n<p>The UK itself aims for <strong>27\u201329 GW of onshore wind by 2030<\/strong>, making repowering essential for meeting national climate goals. (<a title=\"Nadara launches new campaign that puts repowering at the heart of 2030 cleaner power goals - Nadara\" href=\"https:\/\/nadara.com\/media-centre\/nadara-launches-new-campaign-that-puts-repowering-at-the-heart-of-2030-cleaner-power-goals\/?utm_source=chatgpt.com\">Nadara<\/a>)<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"What_This_Means_for_the_Wind_Industry\"><\/span>What This Means for the Wind Industry<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>Industry Impact<\/strong><\/p>\n<ul>\n<li>Accelerates modernisation of the UK\u2019s ageing wind fleet<\/li>\n<li>Reduces project risk for financiers<\/li>\n<li>Encourages reuse of existing land and infrastructure<\/li>\n<\/ul>\n<p><strong>Technical Impact<\/strong><\/p>\n<ul>\n<li>Shift toward standalone LiDAR measurement instead of met-masts<\/li>\n<li>Higher accuracy resource assessments for tall turbines<\/li>\n<\/ul>\n<p><strong>Energy Transition Impact<\/strong><\/p>\n<ul>\n<li>Higher output without expanding land footprint<\/li>\n<li>Faster path to net-zero electricity targets<\/li>\n<\/ul>\n<hr \/>\n<h3><span class=\"ez-toc-section\" id=\"Bottom_Line\"><\/span>Bottom Line<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>By selecting ZX 300e LiDAR technology, Nadara is prioritising <strong>data-driven repowering<\/strong> \u2014 upgrading older wind farms with confidence backed by precise wind measurement.<\/p>\n<p>The project signals a broader industry trend:<br \/>\n<strong>future renewable expansion will rely less on building new sites and more on intelligently upgrading existing<\/strong><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Nadara_Selects_ZX_Lidars_for_UK_Wind_Repowering_Programme_%E2%80%94_Case_Studies_Commentary\"><\/span>Nadara Selects ZX Lidars for UK Wind Repowering Programme \u2014 Case Studies &amp; Commentary<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Below are practical industry-style case studies explaining <em>why this deal matters<\/em> \u2014 technically, financially, and strategically for the wind sector.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Case_Study_1_%E2%80%94_Reducing_Financial_Risk_With_Bankable_Wind_Data\"><\/span>Case Study 1 \u2014 Reducing Financial Risk With Bankable Wind Data<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Situation\"><\/span>Situation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Older UK wind farms were built 15\u201325 years ago using:<\/p>\n<ul>\n<li>short meteorological masts<\/li>\n<li>lower turbine hub heights<\/li>\n<li>limited atmospheric modelling<\/li>\n<\/ul>\n<p>Modern turbines are far taller (often 150\u2013200 m tip height).<br \/>\nHistoric data becomes unreliable \u2192 investors fear under-performance.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Intervention\"><\/span>Intervention<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Nadara deploys <strong>ZX 300e ground-based LiDAR<\/strong> to measure real wind conditions at future turbine height before repowering.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Impact\"><\/span>Impact<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<table>\n<thead>\n<tr>\n<th>Without LiDAR<\/th>\n<th>With LiDAR<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Energy yield estimated<\/td>\n<td>Energy yield measured<\/td>\n<\/tr>\n<tr>\n<td>Higher lender risk premium<\/td>\n<td>Lower financing costs<\/td>\n<\/tr>\n<tr>\n<td>Conservative turbine choice<\/td>\n<td>Optimised turbine selection<\/td>\n<\/tr>\n<tr>\n<td>More uncertainty<\/td>\n<td>Bankable forecast<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3><span class=\"ez-toc-section\" id=\"Result\"><\/span>Result<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Projects become financeable earlier because banks trust <strong>P50\/P90 production forecasts<\/strong>.<\/p>\n<p><strong>Industry takeaway:<\/strong><br \/>\nIn modern wind development, <em>data quality directly reduces cost of capital.<\/em><\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Case_Study_2_%E2%80%94_Repowering_Instead_of_New_Site_Development\"><\/span>Case Study 2 \u2014 Repowering Instead of New Site Development<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Situation-2\"><\/span>Situation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>New UK wind farm permits are slow and difficult due to:<\/p>\n<ul>\n<li>planning constraints<\/li>\n<li>community opposition<\/li>\n<li>grid connection scarcity<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Strategy\"><\/span>Strategy<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Upgrade existing sites instead:<\/p>\n<ul>\n<li>replace many small turbines with fewer large ones<\/li>\n<li>reuse roads and grid infrastructure<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Role_of_ZX_Lidars\"><\/span>Role of ZX Lidars<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>LiDAR determines:<\/p>\n<ul>\n<li>optimum hub height<\/li>\n<li>rotor diameter<\/li>\n<li>wake interactions across terrain<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Real-world_effect\"><\/span>Real-world effect<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<table>\n<thead>\n<tr>\n<th>Old Site<\/th>\n<th>Repowered Site<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>20 \u00d7 1 MW turbines<\/td>\n<td>5 \u00d7 6 MW turbines<\/td>\n<\/tr>\n<tr>\n<td>~20 MW output<\/td>\n<td>~30\u201335 MW output<\/td>\n<\/tr>\n<tr>\n<td>Higher maintenance<\/td>\n<td>Lower maintenance<\/td>\n<\/tr>\n<tr>\n<td>Lower capacity factor<\/td>\n<td>Higher capacity factor<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Outcome:<\/strong><br \/>\nEnergy increases while visual footprint decreases \u2014 a key factor in gaining local approval.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Case_Study_3_%E2%80%94_Choosing_the_Right_Turbine_Model\"><\/span>Case Study 3 \u2014 Choosing the Right Turbine Model<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Problem\"><\/span>Problem<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>At complex terrain sites (common in the UK), wind speed varies dramatically with height.<\/p>\n<p>Wrong turbine selection can:<\/p>\n<ul>\n<li>reduce lifetime output<\/li>\n<li>damage blades due to turbulence<\/li>\n<li>cause warranty disputes<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"How_LiDAR_helps\"><\/span>How LiDAR helps<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>ZX 300e measures:<\/p>\n<ul>\n<li>vertical wind shear<\/li>\n<li>turbulence intensity<\/li>\n<li>veer (direction change with height)<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Decision_improvement\"><\/span>Decision improvement<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<table>\n<thead>\n<tr>\n<th>Decision area<\/th>\n<th>Before<\/th>\n<th>After<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Hub height<\/td>\n<td>Standard choice<\/td>\n<td>Site-specific<\/td>\n<\/tr>\n<tr>\n<td>Rotor size<\/td>\n<td>Manufacturer default<\/td>\n<td>Optimised<\/td>\n<\/tr>\n<tr>\n<td>Lifetime output<\/td>\n<td>Assumed<\/td>\n<td>Modelled accurately<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Result:<\/strong><br \/>\nBetter turbine matching can improve project revenue by several million pounds over lifespan.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Case_Study_4_%E2%80%94_Accelerating_Project_Approval\"><\/span>Case Study 4 \u2014 Accelerating Project Approval<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Challenge\"><\/span>Challenge<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Authorities increasingly require environmental and operational certainty.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Evidence_provided_by_LiDAR\"><\/span>Evidence provided by LiDAR<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>accurate noise modelling<\/li>\n<li>shadow flicker modelling<\/li>\n<li>wake loss prediction<\/li>\n<li>bird interaction studies<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Outcome\"><\/span>Outcome<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Planning approvals become easier because:<\/p>\n<blockquote><p>Regulators trust measured data more than simulations.<\/p><\/blockquote>\n<p><strong>Industry trend:<\/strong><br \/>\nLiDAR is becoming a planning tool \u2014 not just an engineering tool.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Case_Study_5_%E2%80%94_Long-Term_Operations_Optimization\"><\/span>Case Study 5 \u2014 Long-Term Operations Optimization<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"After_construction\"><\/span>After construction<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>LiDAR remains useful for:<\/p>\n<ul>\n<li>performance verification<\/li>\n<li>turbine warranty validation<\/li>\n<li>diagnosing underperformance<\/li>\n<\/ul>\n<p>Operators can compare:<br \/>\n<strong>expected wind vs real power output<\/strong><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Benefit\"><\/span>Benefit<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Detect issues early:<\/p>\n<ul>\n<li>yaw misalignment<\/li>\n<li>blade degradation<\/li>\n<li>control system inefficiencies<\/li>\n<\/ul>\n<p>This protects lifetime revenue.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Commentary_%E2%80%94_What_This_Deal_Signals\"><\/span>Commentary \u2014 What This Deal Signals<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"1_Repowering_Is_the_Next_Growth_Phase_of_Wind_Energy\"><\/span>1. Repowering Is the Next Growth Phase of Wind Energy<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The easiest clean energy is no longer building new farms \u2014<br \/>\nit is upgrading old ones.<\/p>\n<p>We are entering the <strong>\u201cWind 2.0 era\u201d<\/strong>:<\/p>\n<blockquote><p>Same land \u2192 more electricity.<\/p><\/blockquote>\n<hr \/>\n<h3><span class=\"ez-toc-section\" id=\"2_Measurement_Technology_Is_Now_Financial_Infrastructure\"><\/span>2. Measurement Technology Is Now Financial Infrastructure<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Historically:<br \/>\nEngineering tool \u2192 optional<\/p>\n<p>Now:<br \/>\nFinancial validation tool \u2192 essential<\/p>\n<p>Investors increasingly require <strong>bankable measurement technology<\/strong> before funding.<\/p>\n<hr \/>\n<h3><span class=\"ez-toc-section\" id=\"3_Digitalisation_of_Renewables\"><\/span>3. Digitalisation of Renewables<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Wind farms are becoming data assets:<\/p>\n<ul>\n<li>predictive analytics<\/li>\n<li>performance modelling<\/li>\n<li>insurance verification<\/li>\n<li>energy trading accuracy<\/li>\n<\/ul>\n<p>LiDAR sits at the centre of this shift.<\/p>\n<hr \/>\n<h3><span class=\"ez-toc-section\" id=\"4_UK_Market_Implications\"><\/span>4. UK Market Implications<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The UK has a large ageing onshore fleet.<br \/>\nIf widely replicated, repowering programmes could:<\/p>\n<ul>\n<li>boost generation without new land use<\/li>\n<li>reduce electricity price volatility<\/li>\n<li>accelerate decarbonisation faster than new builds alone<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Final_Insight\"><\/span>Final Insight<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Nadara\u2019s selection of ZX Lidars is less about equipment procurement and more about <strong>de-risking renewable investment<\/strong>.<\/p>\n<p>Modern renewable projects succeed when three elements align:<\/p>\n<p><strong>Engineering accuracy + Financial confidence + Regulatory acceptance<\/strong><\/p>\n<p>LiDAR technology now connects all three \u2014 which is why deals like this are becoming standard across global wind markets.<\/p>\n<p><strong>ones.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nadara Selects ZX Lidars for UK Wind Repowering Programme \u2014 Full Details &nbsp; What the Agreement Covers The deal involves the supply of a fleet&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,6],"tags":[],"class_list":["post-991302","post","type-post","status-publish","format-standard","hentry","category-gb-news","category-uk-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Nadara Selects ZX Lidars for UK Wind Repowering Programme - UK News &amp; Updates<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nadara Selects ZX Lidars for UK Wind Repowering Programme - UK News &amp; Updates\" \/>\n<meta property=\"og:description\" content=\"Nadara Selects ZX Lidars for UK Wind Repowering Programme \u2014 Full Details &nbsp; What the Agreement Covers The deal involves the supply of a fleet...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/\" \/>\n<meta property=\"og:site_name\" content=\"UK News &amp; Updates\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-12T14:31:38+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/5529805dee92503827c0c27ed13d55a3\"},\"headline\":\"Nadara Selects ZX Lidars for UK Wind Repowering Programme\",\"datePublished\":\"2026-02-12T14:31:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/\"},\"wordCount\":1034,\"publisher\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/#organization\"},\"articleSection\":[\"GB News\",\"UK News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/\",\"url\":\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/\",\"name\":\"Nadara Selects ZX Lidars for UK Wind Repowering Programme - UK News &amp; Updates\",\"isPartOf\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/#website\"},\"datePublished\":\"2026-02-12T14:31:38+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ukpostcode.org\/content\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nadara Selects ZX Lidars for UK Wind Repowering Programme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#website\",\"url\":\"https:\/\/ukpostcode.org\/content\/\",\"name\":\"UK News &amp; Updates\",\"description\":\"UK Post Code\",\"publisher\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ukpostcode.org\/content\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#organization\",\"name\":\"UK News &amp; Updates\",\"url\":\"https:\/\/ukpostcode.org\/content\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ukpostcode.org\/content\/wp-content\/uploads\/2023\/09\/cropped-uk-logo-1.png\",\"contentUrl\":\"https:\/\/ukpostcode.org\/content\/wp-content\/uploads\/2023\/09\/cropped-uk-logo-1.png\",\"width\":307,\"height\":85,\"caption\":\"UK News &amp; Updates\"},\"image\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/5529805dee92503827c0c27ed13d55a3\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6aac6e3af4be1d6689e924bbaccd84fc0cc6c5f6680490dc6f0a1f09b87d57f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/6aac6e3af4be1d6689e924bbaccd84fc0cc6c5f6680490dc6f0a1f09b87d57f1?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/ukpostcode.org\/content\"],\"url\":\"https:\/\/ukpostcode.org\/content\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Nadara Selects ZX Lidars for UK Wind Repowering Programme - UK News &amp; Updates","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/","og_locale":"en_US","og_type":"article","og_title":"Nadara Selects ZX Lidars for UK Wind Repowering Programme - UK News &amp; Updates","og_description":"Nadara Selects ZX Lidars for UK Wind Repowering Programme \u2014 Full Details &nbsp; What the Agreement Covers The deal involves the supply of a fleet...","og_url":"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/","og_site_name":"UK News &amp; Updates","article_published_time":"2026-02-12T14:31:38+00:00","author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#article","isPartOf":{"@id":"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/"},"author":{"name":"admin","@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/5529805dee92503827c0c27ed13d55a3"},"headline":"Nadara Selects ZX Lidars for UK Wind Repowering Programme","datePublished":"2026-02-12T14:31:38+00:00","mainEntityOfPage":{"@id":"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/"},"wordCount":1034,"publisher":{"@id":"https:\/\/ukpostcode.org\/content\/#organization"},"articleSection":["GB News","UK News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/","url":"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/","name":"Nadara Selects ZX Lidars for UK Wind Repowering Programme - UK News &amp; Updates","isPartOf":{"@id":"https:\/\/ukpostcode.org\/content\/#website"},"datePublished":"2026-02-12T14:31:38+00:00","breadcrumb":{"@id":"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/ukpostcode.org\/content\/nadara-selects-zx-lidars-for-uk-wind-repowering-programme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ukpostcode.org\/content\/"},{"@type":"ListItem","position":2,"name":"Nadara Selects ZX Lidars for UK Wind Repowering Programme"}]},{"@type":"WebSite","@id":"https:\/\/ukpostcode.org\/content\/#website","url":"https:\/\/ukpostcode.org\/content\/","name":"UK News &amp; Updates","description":"UK Post Code","publisher":{"@id":"https:\/\/ukpostcode.org\/content\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ukpostcode.org\/content\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ukpostcode.org\/content\/#organization","name":"UK News &amp; Updates","url":"https:\/\/ukpostcode.org\/content\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/logo\/image\/","url":"https:\/\/ukpostcode.org\/content\/wp-content\/uploads\/2023\/09\/cropped-uk-logo-1.png","contentUrl":"https:\/\/ukpostcode.org\/content\/wp-content\/uploads\/2023\/09\/cropped-uk-logo-1.png","width":307,"height":85,"caption":"UK News &amp; Updates"},"image":{"@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/5529805dee92503827c0c27ed13d55a3","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/6aac6e3af4be1d6689e924bbaccd84fc0cc6c5f6680490dc6f0a1f09b87d57f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6aac6e3af4be1d6689e924bbaccd84fc0cc6c5f6680490dc6f0a1f09b87d57f1?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/ukpostcode.org\/content"],"url":"https:\/\/ukpostcode.org\/content\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/posts\/991302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/comments?post=991302"}],"version-history":[{"count":1,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/posts\/991302\/revisions"}],"predecessor-version":[{"id":991303,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/posts\/991302\/revisions\/991303"}],"wp:attachment":[{"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/media?parent=991302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/categories?post=991302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/tags?post=991302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}