{"id":983252,"date":"2025-11-28T14:10:36","date_gmt":"2025-11-28T14:10:36","guid":{"rendered":"https:\/\/ukpostcode.org\/content\/?p=983252"},"modified":"2025-11-28T14:10:36","modified_gmt":"2025-11-28T14:10:36","slug":"mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building","status":"publish","type":"post","link":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/","title":{"rendered":"McLaren Construction to deliver the UK&#8217;s largest all-timber office building"},"content":{"rendered":"<p><img decoding=\"async\" src=\"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2025\/11\/Xylo-1.jpg\" alt=\"Image\" \/><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/mappinglondon.co.uk\/wp-content\/uploads\/2014\/09\/urbanwalkabout_clerkenwell.png\" alt=\"Image\" \/><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/woodcentral.b-cdn.net\/wp-content\/uploads\/2025\/11\/woodcentral-all-timber-frame-clt-glulam-xylo_02-fotor-2025112813112.jpg\" alt=\"Image\" \/><\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_73 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_What_is_the_project_%E2%80%94_basic_facts_about_Xylo\" title=\"\u00a0What is the project \u2014 basic facts about Xylo\">\u00a0What is the project \u2014 basic facts about Xylo<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Design_Sustainability_Features_%E2%80%94_Why_Timber_Why_Now\" title=\"\u00a0Design &amp; Sustainability Features \u2014 Why Timber, Why Now\">\u00a0Design &amp; Sustainability Features \u2014 Why Timber, Why Now<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Why_This_Matters_%E2%80%94_Industry_Significance_Broader_Implications\" title=\"\u00a0Why This Matters \u2014 Industry Significance &amp; Broader Implications\">\u00a0Why This Matters \u2014 Industry Significance &amp; Broader Implications<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Push_for_sustainable_construction_carbon%E2%80%91conscious_workplaces\" title=\"\u00a0Push for sustainable construction &amp; carbon\u2011conscious workplaces\">\u00a0Push for sustainable construction &amp; carbon\u2011conscious workplaces<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Flexibility_longevity_in_office_real_estate\" title=\"\u00a0Flexibility &amp; longevity in office real estate\">\u00a0Flexibility &amp; longevity in office real estate<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Location_urban_context_%E2%80%94_sustainable_offices_in_central_London\" title=\"\u00a0Location &amp; urban context \u2014 sustainable offices in central London\">\u00a0Location &amp; urban context \u2014 sustainable offices in central London<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Broader_push_for_climate_goals_net%E2%80%91zero_ambitions\" title=\"\u00a0Broader push for climate goals &amp; net\u2011zero ambitions\">\u00a0Broader push for climate goals &amp; net\u2011zero ambitions<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_What_People_Behind_the_Project_Are_Saying_%E2%80%94_Comments_Stakeholder_Perspectives\" title=\"\u00a0What People Behind the Project Are Saying \u2014 Comments &amp; Stakeholder Perspectives\">\u00a0What People Behind the Project Are Saying \u2014 Comments &amp; Stakeholder Perspectives<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Questions_Challenges_What_Could_Make_or_Break_It\" title=\"\u00a0Questions, Challenges &amp; What Could Make or Break It\">\u00a0Questions, Challenges &amp; What Could Make or Break It<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_What_to_Watch_%E2%80%94_Whats_Next_What_Ill_Be_Looking_For\" title=\"\u00a0What to Watch \u2014 What\u2019s Next &amp; What I\u2019ll Be Looking For\">\u00a0What to Watch \u2014 What\u2019s Next &amp; What I\u2019ll Be Looking For<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_What_Xylo_is_%E2%80%94_key_facts_project_scope\" title=\"\u00a0What Xylo is \u2014 key facts &amp; project scope\">\u00a0What Xylo is \u2014 key facts &amp; project scope<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Why_It_Matters_%E2%80%94_What_Makes_This_Project_Stand_Out\" title=\"\u00a0Why It Matters \u2014 What Makes This Project Stand Out\">\u00a0Why It Matters \u2014 What Makes This Project Stand Out<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Timber_sustainability_at_scale\" title=\"\u00a0Timber &amp; sustainability at scale\">\u00a0Timber &amp; sustainability at scale<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Flexibility_future%E2%80%91proofing\" title=\"\u00a0Flexibility &amp; future\u2011proofing\">\u00a0Flexibility &amp; future\u2011proofing<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Signalling_shift_for_UK_construction_real_estate\" title=\"\u00a0Signalling shift for UK construction &amp; real estate\">\u00a0Signalling shift for UK construction &amp; real estate<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_What_People_Behind_the_Project_Are_Saying_%E2%80%94_Comments_from_Stakeholders\" title=\"\u00a0What People Behind the Project Are Saying \u2014 Comments from Stakeholders\">\u00a0What People Behind the Project Are Saying \u2014 Comments from Stakeholders<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_What_This_Could_Mean_%E2%80%94_Potential_Benefits_Broader_Impacts\" title=\"\u00a0What This Could Mean \u2014 Potential Benefits &amp; Broader Impacts\">\u00a0What This Could Mean \u2014 Potential Benefits &amp; Broader Impacts<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_What_to_Watch_What_Could_Go_Wrong_%E2%80%94_Challenges_Risks\" title=\"\u00a0What to Watch \/ What Could Go Wrong \u2014 Challenges &amp; Risks\">\u00a0What to Watch \/ What Could Go Wrong \u2014 Challenges &amp; Risks<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Broader_%E2%80%9CCase%E2%80%91Study_Context%E2%80%9D_Where_Xylo_Fits_Relative_to_Global_Timber_Projects\" title=\"\u00a0Broader \u201cCase\u2011Study Context\u201d: Where Xylo Fits Relative to Global Timber Projects\">\u00a0Broader \u201cCase\u2011Study Context\u201d: Where Xylo Fits Relative to Global Timber Projects<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_What_Xylo_is_%E2%80%94_key_facts_project_scope-2\" title=\"\u00a0What Xylo is \u2014 key facts &amp; project scope\">\u00a0What Xylo is \u2014 key facts &amp; project scope<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Why_It_Matters_%E2%80%94_What_Makes_This_Project_Stand_Out-2\" title=\"\u00a0Why It Matters \u2014 What Makes This Project Stand Out\">\u00a0Why It Matters \u2014 What Makes This Project Stand Out<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Timber_sustainability_at_scale-2\" title=\"\u00a0Timber &amp; sustainability at scale\">\u00a0Timber &amp; sustainability at scale<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Flexibility_future%E2%80%91proofing-2\" title=\"\u00a0Flexibility &amp; future\u2011proofing\">\u00a0Flexibility &amp; future\u2011proofing<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Signalling_shift_for_UK_construction_real_estate-2\" title=\"\u00a0Signalling shift for UK construction &amp; real estate\">\u00a0Signalling shift for UK construction &amp; real estate<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_What_People_Behind_the_Project_Are_Saying_%E2%80%94_Comments_Stakeholder_Perspectives-2\" title=\"\u00a0What People Behind the Project Are Saying \u2014 Comments &amp; Stakeholder Perspectives\">\u00a0What People Behind the Project Are Saying \u2014 Comments &amp; Stakeholder Perspectives<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_Broader_%E2%80%9CCase%E2%80%91Study_Context%E2%80%9D_Where_Xylo_Fits_Relative_to_Other_Timber_Projects\" title=\"\u00a0Broader \u201cCase\u2011Study Context\u201d: Where Xylo Fits Relative to Other Timber Projects\">\u00a0Broader \u201cCase\u2011Study Context\u201d: Where Xylo Fits Relative to Other Timber Projects<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_What_Could_Go_Wrong_%E2%80%94_Risks_Challenges_What_to_Watch\" title=\"\u00a0What Could Go Wrong \u2014 Risks, Challenges &amp; What to Watch\">\u00a0What Could Go Wrong \u2014 Risks, Challenges &amp; What to Watch<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#_What_to_Watch_%E2%80%94_Whats_Next_What_I_Would_Monitor_Over_the_Next_Few_Years\" title=\"\u00a0What to Watch \u2014 What\u2019s Next &amp; What I Would Monitor Over the Next Few Years\">\u00a0What to Watch \u2014 What\u2019s Next &amp; What I Would Monitor Over the Next Few Years<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"_What_is_the_project_%E2%80%94_basic_facts_about_Xylo\"><\/span>\u00a0What is the project \u2014 basic facts about Xylo<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li><strong>What &amp; where<\/strong>: Xylo is a nine\u2011storey office building in central London (Clerkenwell), on the corner of Gray\u2019s Inn Road and Clerkenwell Road \u2014 a site with excellent transport links. (<a title=\"Global Holdings appoints McLaren for London's timber tower - CRE Media Europe\" href=\"https:\/\/www.cremediaeurope.com\/news\/global-holdings-appoints-mclaren-for-london-s-timber-tower~MaJp1Wgk\/?utm_source=chatgpt.com\">cremediaeurope.com<\/a>)<\/li>\n<li><strong>Size<\/strong>: Roughly <strong>100,000 sq ft<\/strong> of workspace (\u2248\u202f9,290\u202fm\u00b2) over nine floors. (<a title=\"Global Holdings Management Group names McLaren Construction as contractor for Xylo, the UK\u2019s largest timber frame office scheme \u2013 Timber Media\" href=\"https:\/\/www.timbermedia.co.uk\/global-holdings-management-group-names-mclaren-construction-as-contractor-for-xylo-the-uks-largest-timber-frame-office-scheme\/?utm_source=chatgpt.com\">Timber Media<\/a>)<\/li>\n<li><strong>What \u201call\u2011timber\u201d means here<\/strong>: The structural frame will use engineered timber \u2014 namely glulam beams and cross\u2011laminated timber (CLT) supplied by a specialist timber\u2011supplier. (<a title=\"McLaren Construction Appointed To Build UK\u2019s Largest All-Timber Office Building - PM Today\" href=\"https:\/\/www.pmtoday.co.uk\/mclaren-construction-appointed-to-build-uks-largest-all-timber-office-building\/?utm_source=chatgpt.com\">PM Today<\/a>)<\/li>\n<li><strong>Timeline<\/strong>: McLaren begins full construction after enabling works. Completion is scheduled for <strong>Q2 2028<\/strong>. (<a title=\"Timber Takes Centre Stage as McLaren Secures Landmark Clerkenwell Office\" href=\"https:\/\/bdcmagazine.com\/2025\/11\/timber-takes-centre-stage-as-mclaren-secures-landmark-clerkenwell-office\/?utm_source=chatgpt.com\">BDC Magazine<\/a>)<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_Design_Sustainability_Features_%E2%80%94_Why_Timber_Why_Now\"><\/span>\u00a0Design &amp; Sustainability Features \u2014 Why Timber, Why Now<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Xylo is not just \u201canother office building\u201d \u2014 it\u2019s being pitched as a <strong>benchmark for sustainable, low\u2011carbon workplaces<\/strong> in central London. Key aspects:<\/p>\n<ul>\n<li><strong>Carbon reduction &amp; storage<\/strong>: The timber frame will store more than <strong>2,400 tonnes of CO\u2082<\/strong>. Compared with a typical office building, embodied carbon is expected to be <strong>50% lower<\/strong> and operational carbon emissions up to <strong>82% lower<\/strong>. (<a title=\"Global Holdings appoints McLaren for London's timber tower - CRE Media Europe\" href=\"https:\/\/www.cremediaeurope.com\/news\/global-holdings-appoints-mclaren-for-london-s-timber-tower~MaJp1Wgk\/?utm_source=chatgpt.com\">cremediaeurope.com<\/a>)<\/li>\n<li><strong>Certifications targeted<\/strong>: The project aims for high\u2011level sustainability\/green building credentials: LETI Pioneer, NABERS UK 5.5\u2011star, and BREEAM \u201cExcellent.\u201d (<a title=\"McLaren Construction Appointed To Build UK\u2019s Largest All-Timber Office Building - PM Today\" href=\"https:\/\/www.pmtoday.co.uk\/mclaren-construction-appointed-to-build-uks-largest-all-timber-office-building\/?utm_source=chatgpt.com\">PM Today<\/a>)<\/li>\n<li><strong>Flexible, future\u2011proof design<\/strong>: Because it uses a modular timber\u2011frame system, internal spaces can be reconfigured over time \u2014 making it easier to adapt layouts (for offices, collaborative spaces, amenities) without massive structural intervention. (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<li><strong>Workplace\u2011amenities &amp; well\u2011being focus<\/strong>: The building will have a 6.5\u2011meter vaulted lobby; a town hall space (bar\/lounge\/auditorium); a caf\u00e9\/restaurant; a rooftop garden; landscaped terraces; cycle parking and shower facilities for active commuting \u2014 all aimed at improving occupant experience. (<a title=\"Global Holdings Management Group names McLaren Construction as contractor for Xylo, the UK\u2019s largest timber frame office scheme \u2013 Timber Media\" href=\"https:\/\/www.timbermedia.co.uk\/global-holdings-management-group-names-mclaren-construction-as-contractor-for-xylo-the-uks-largest-timber-frame-office-scheme\/?utm_source=chatgpt.com\">Timber Media<\/a>)<\/li>\n<li><strong>Natural materials &amp; indoor environmental quality<\/strong>: Interiors will emphasise natural materials, low\u2011VOC finishes and energy\u2011efficient systems \u2014 aligning with trending demands for healthy, sustainable workplaces. (<a title=\"Global Holdings Management Group names McLaren Construction as contractor for Xylo, the UK\u2019s largest timber frame office scheme \u2013 Timber Media\" href=\"https:\/\/www.timbermedia.co.uk\/global-holdings-management-group-names-mclaren-construction-as-contractor-for-xylo-the-uks-largest-timber-frame-office-scheme\/?utm_source=chatgpt.com\">Timber Media<\/a>)<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_Why_This_Matters_%E2%80%94_Industry_Significance_Broader_Implications\"><\/span>\u00a0Why This Matters \u2014 Industry Significance &amp; Broader Implications<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"_Push_for_sustainable_construction_carbon%E2%80%91conscious_workplaces\"><\/span>\u00a0Push for sustainable construction &amp; carbon\u2011conscious workplaces<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Xylo embodies a strong shift away from traditional steel\/concrete office construction toward <strong>mass\u2011timber \/ engineered\u2011timber<\/strong> methods. This signals growing confidence that timber can support major commercial\u2011scale buildings \u2014 not just houses or small timber builds.<\/li>\n<li>If successful, it sets a precedent: other developers and contractors may follow \u2014 accelerating a broader transformation in the UK construction sector toward <strong>low\u2011carbon, environmentally conscious building techniques<\/strong>.<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"_Flexibility_longevity_in_office_real_estate\"><\/span>\u00a0Flexibility &amp; longevity in office real estate<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>With rapidly changing workplace demands (hybrid work, flexible layouts, multi\u2011use spaces), a timber design that allows future reconfiguration is a big plus. It reduces lock\u2011in, lowers future renovation costs, and supports evolving workplace needs.<\/li>\n<li>It could influence how landlords and occupiers think about long-term workplace investments: sustainable + adaptable buildings may confer competitive advantage in attracting tenants who value ESG (environmental, social, governance) credentials.<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"_Location_urban_context_%E2%80%94_sustainable_offices_in_central_London\"><\/span>\u00a0Location &amp; urban context \u2014 sustainable offices in central London<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>By locating the project in central London (Clerkenwell \/ near Bloomsbury, King\u2019s Cross, Farringdon), the developers combine sustainability with prime real estate value and excellent transport connectivity.<\/li>\n<li>This could highlight a model: urban, timber\u2011framed, high\u2011spec offices \u2014 merging green credentials with convenience \u2014 potentially influencing future office\u2011market demand and development strategy in dense cities.<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"_Broader_push_for_climate_goals_net%E2%80%91zero_ambitions\"><\/span>\u00a0Broader push for climate goals &amp; net\u2011zero ambitions<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>As governments, businesses, and institutions increasingly commit to net\u2011zero carbon goals \u2014 embodied as well as operational \u2014 projects like Xylo demonstrate how commercial real estate can contribute.<\/li>\n<li>It may influence regulatory, planning and building\u2011code evolution \u2014 pushing mass\u2011timber and engineered\u2011wood office buildings from niche to mainstream.<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_What_People_Behind_the_Project_Are_Saying_%E2%80%94_Comments_Stakeholder_Perspectives\"><\/span>\u00a0What People Behind the Project Are Saying \u2014 Comments &amp; Stakeholder Perspectives<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li>Global Holdings Management Group (developer) \u2014 through CEO Josh Lawrence \u2014 calls Xylo \u201ca game\u2011changing project and significant milestone for our industry,\u201d designed for occupiers who lead in their sectors, marrying sustainability with high\u2011quality design in a vibrant neighbourhood. (<a title=\"Global Holdings appoints McLaren for London's timber tower - CRE Media Europe\" href=\"https:\/\/www.cremediaeurope.com\/news\/global-holdings-appoints-mclaren-for-london-s-timber-tower~MaJp1Wgk\/?utm_source=chatgpt.com\">cremediaeurope.com<\/a>)<\/li>\n<li>McLaren\u2019s London &amp; South MD, Darren Gill, says Xylo represents \u201ca pioneering use of structural timber and off\u2011site manufacturing on a typically tight central London site,\u201d and that the firm will use digital information management to monitor carbon performance throughout construction. (<a title=\"Global Holdings Management Group names McLaren Construction as contractor for Xylo, the UK\u2019s largest timber frame office scheme \u2013 Timber Media\" href=\"https:\/\/www.timbermedia.co.uk\/global-holdings-management-group-names-mclaren-construction-as-contractor-for-xylo-the-uks-largest-timber-frame-office-scheme\/?utm_source=chatgpt.com\">Timber Media<\/a>)<\/li>\n<li>In public\u2011facing descriptions the project is billed as a new benchmark for sustainable workplaces \u2014 a demonstration that \u201cengineered timber office developments\u201d are viable at large scale in the UK. (<a title=\"McLaren Construction appointed to deliver Xylo, the UK\u2019s largest all timber frame office building | Built Offsite\" href=\"https:\/\/builtoffsite.com.au\/news\/mclaren-construction-appointed-to-deliver-xylo-the-uks-largest-all-timber-frame-office-building\/?utm_source=chatgpt.com\">Built Offsite<\/a>)<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_Questions_Challenges_What_Could_Make_or_Break_It\"><\/span>\u00a0Questions, Challenges &amp; What Could Make or Break It<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>While Xylo is ambitious and promising, there are factors that will determine whether it delivers on its full potential \u2014 or ends up as a high\u2011profile experiment.<\/p>\n<ul>\n<li><strong>Timber supply &amp; quality control<\/strong>: To deliver at scale, sourcing high\u2011quality engineered timber (glulam, CLT) reliably is crucial. Supply\u2011chain bottlenecks, cost fluctuations, or craftsmanship issues could affect timelines, budgets, or structural quality.<\/li>\n<li><strong>Regulatory, building\u2011code, fire\u2011safety &amp; insurance considerations<\/strong>: Large timber buildings historically face scrutiny over fire safety, durability, moisture, and compliance with regulations. As this is a \u201clargest\u2011of\u2011its\u2011kind\u201d project, regulators, insurers, and certifiers will likely watch closely.<\/li>\n<li><strong>Risk vs reward for occupiers<\/strong>: For tenants, committing to a timber\u2011office building might entail some perceived risk \u2014 unfamiliarity, potential insurance\/premium issues, or uncertainty over longevity compared with traditional steel\/concrete offices.<\/li>\n<li><strong>Economic viability<\/strong>: Timber and sustainable design often come at higher upfront cost; the long\u2011term value depends on rental demand, occupier willingness to pay for \u201cgreen premium,\u201d and market acceptance.<\/li>\n<li><strong>Scalability and replication<\/strong>: Even if successful, will other developers follow? The broader impact depends on whether this remains a rare flagship \u2014 or becomes a scalable model across London and the UK.<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_What_to_Watch_%E2%80%94_Whats_Next_What_Ill_Be_Looking_For\"><\/span>\u00a0What to Watch \u2014 What\u2019s Next &amp; What I\u2019ll Be Looking For<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Here are the key signals to follow over 2026\u20132028 to see if Xylo lives up to its promise:<\/p>\n<ul>\n<li>Progress on construction: whether McLaren hits milestones on time, whether off\u2011site timber assembly works smoothly, and any technical or planning surprises.<\/li>\n<li>Building certification &amp; performance: whether Xylo truly achieves LETI Pioneer, NABERS UK, BREEAM \u2014 and how operational carbon \/ energy performance behave once occupied.<\/li>\n<li>Tenant uptake and market feedback: which businesses move in, and whether demand grows for timber\u2011based offices elsewhere.<\/li>\n<li>Regulatory response &amp; insurance\/maintenance data: how fire safety, maintenance, durability, and building regulations handle large timber\u2011frame offices over time.<\/li>\n<li>Industry reaction &amp; replication: whether other developers commission similar mass\u2011timber offices, signaling a shift in office\u2011building norms across the UK.<\/li>\n<li>Here\u2019s a detailed look \u2014 with <strong>case\u2011studies, facts, and stakeholder comments<\/strong> \u2014 on the announcement that McLaren Construction has been selected to build what will be the UK\u2019s largest all\u2011timber office building, Xylo. This includes what the project involves, why many in the industry are excited \u2014 and what some of the open questions are.\n<p><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Xylo-exterior-Global-Holdings-Management-Group-1200x828.jpg\" alt=\"Image\" \/><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/builtoffsite.com.au\/wp-content\/uploads\/2025\/11\/built-offsite-mclaren-construction-xylo-timber-frame-construction_.jpg\" alt=\"Image\" \/><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/mappinglondon.co.uk\/wp-content\/uploads\/2014\/09\/urbanwalkabout_clerkenwell.png\" alt=\"Image\" \/><\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_What_Xylo_is_%E2%80%94_key_facts_project_scope\"><\/span>\u00a0What Xylo is \u2014 key facts &amp; project scope<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li><strong>What &amp; where<\/strong>: Xylo will be built in central London (Clerkenwell, on the corner of Gray\u2019s Inn Road and Clerkenwell Road). (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<li><strong>Size &amp; structure<\/strong>: The building covers about <strong>100,000\u202fsq ft<\/strong> (~9,290\u202fm\u00b2\/\u22489,000\u202fm\u00b2) over <strong>nine storeys<\/strong>, using a full timber structural frame made of engineered wood \u2014 glulam beams + cross\u2011laminated timber (CLT) slabs. (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<li><strong>Design &amp; amenities<\/strong>: Among its features: a <strong>6.5\u2011metre vaulted lobby<\/strong>, a \u201ctown\u2011hall\u201d style auditorium\/bar\/lounge, a caf\u00e9\/restaurant, <strong>five landscaped terraces<\/strong>, a <strong>rooftop garden + yoga deck<\/strong>, cycle\u2011parking + showers (to support active commuting), and flexible, open\u2011plan workspace. (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<li><strong>Timeline<\/strong>: McLaren is set to deliver the building by <strong>Q2 2028<\/strong>, following enabling works. (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<\/ul>\n<p>So Xylo aims to combine high\u2011end office amenities, modern workplace design, and sustainability \u2014 on a significant scale for London.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_Why_It_Matters_%E2%80%94_What_Makes_This_Project_Stand_Out\"><\/span>\u00a0Why It Matters \u2014 What Makes This Project Stand Out<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"_Timber_sustainability_at_scale\"><\/span>\u00a0Timber &amp; sustainability at scale<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>The timber frame is not just aesthetic \u2014 it\u2019s part of a deliberate sustainability strategy: the structure will <strong>sequester over 2,400 tonnes of CO\u2082<\/strong>. (<a title=\"Global Holdings Management Group names McLaren Construction as contractor for Xylo, the UK\u2019s largest timber frame office scheme \u2013 Timber Media\" href=\"https:\/\/www.timbermedia.co.uk\/global-holdings-management-group-names-mclaren-construction-as-contractor-for-xylo-the-uks-largest-timber-frame-office-scheme\/?utm_source=chatgpt.com\">Timber Media<\/a>)<\/li>\n<li>Compared with typical new London offices built with concrete\/steel, Xylo is designed to deliver <strong>50% lower embodied carbon<\/strong> and up to <strong>82% lower operational carbon emissions<\/strong>. (<a title=\"McLaren Construction Appointed To Build UK\u2019s Largest All-Timber Office Building - PM Today\" href=\"https:\/\/www.pmtoday.co.uk\/mclaren-construction-appointed-to-build-uks-largest-all-timber-office-building\/?utm_source=chatgpt.com\">PM Today<\/a>)<\/li>\n<li>The project is targeting high sustainability\/environmental ratings: LETI Pioneer, NABERS UK (5.5\u2011star), and BREEAM \u201cExcellent\u201d. (<a title=\"Global Holdings appoints McLaren for London's timber tower - CRE Media Europe\" href=\"https:\/\/www.cremediaeurope.com\/news\/global-holdings-appoints-mclaren-for-london-s-timber-tower~MaJp1Wgk\/?utm_source=chatgpt.com\">CRE Media Europe<\/a>)<\/li>\n<\/ul>\n<p><strong>Why that matters:<\/strong> As businesses and regulators press for net\u2011zero and lower\u2011carbon buildings, Xylo could become a benchmark \u2014 showing that large-scale, high\u2011spec offices <em>don\u2019t<\/em> have to rely on carbon\u2011intensive materials.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"_Flexibility_future%E2%80%91proofing\"><\/span>\u00a0Flexibility &amp; future\u2011proofing<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Timber\u2011frame buildings with CLT\/glulam allow for modular, reconfigurable interior layouts. This is good for evolving workplace needs (hybrid working, flexible space use, easy re\u2011modelling without heavy structural work). (<a title=\"Global Holdings Management Group names McLaren Construction as contractor for Xylo, the UK\u2019s largest timber frame office scheme \u2013 Timber Media\" href=\"https:\/\/www.timbermedia.co.uk\/global-holdings-management-group-names-mclaren-construction-as-contractor-for-xylo-the-uks-largest-timber-frame-office-scheme\/?utm_source=chatgpt.com\">Timber Media<\/a>)<\/li>\n<li>With amenities like terraces, garden, social areas, active\u2011commuter facilities \u2014 Xylo is positioned not just as \u201cdesk space,\u201d but a modern \u201cworkplace experience\u201d that emphasizes wellbeing and adaptability. (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"_Signalling_shift_for_UK_construction_real_estate\"><\/span>\u00a0Signalling shift for UK construction &amp; real estate<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Making the UK\u2019s \u201clargest all\u2011timber office building\u201d helps validate engineered timber (glulam\/CLT) at a scale and location (central London) where previously concrete\/steel dominated. Many in construction see this as a signal that timber can go mainstream beyond small builds or residential projects. (<a title=\"McLaren to build UK\u2019s largest timber-frame office in London - Construction Management\" href=\"https:\/\/constructionmanagement.co.uk\/mclaren-to-build-uks-largest-timber-frame-office-in-london\/?utm_source=chatgpt.com\">Construction Management<\/a>)<\/li>\n<li>For occupiers (companies), this could mean a new class of \u201cgreen, healthy, flexible\u201d offices \u2014 possibly influencing demand, lease\u2011up, and long\u2011term value of sustainable buildings relative to conventional offices.<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_What_People_Behind_the_Project_Are_Saying_%E2%80%94_Comments_from_Stakeholders\"><\/span>\u00a0What People Behind the Project Are Saying \u2014 Comments from Stakeholders<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li>Global Holdings Management Group (the developer) described Xylo as \u201ca game\u2011changing project\u201d \u2014 intended for organisations that lead their sectors \u2014 combining \u201cadvanced environmental design\u201d with high\u2011quality workspace in a prime London neighbourhood. (<a title=\"McLaren wins UK\u2019s largest timber frame office building | Construction Enquirer News\" href=\"https:\/\/www.constructionenquirer.com\/2025\/11\/26\/mclaren-wins-uks-largest-timber-frame-office-building\/?utm_source=chatgpt.com\">Construction Enquirer<\/a>)<\/li>\n<li>McLaren\u2019s London &amp; South Managing Director emphasized the pioneering use of structural timber and off\u2011site manufacturing \u2014 stating the project will \u201credefine what a sustainable, healthy workplace can be\u201d on a tight central\u2011London site. (<a title=\"McLaren to build UK\u2019s largest timber-frame office in London - Construction Management\" href=\"https:\/\/constructionmanagement.co.uk\/mclaren-to-build-uks-largest-timber-frame-office-in-london\/?utm_source=chatgpt.com\">Construction Management<\/a>)<\/li>\n<li>The project team (architects, structural &amp; sustainability engineers) present Xylo as more than a conventional office \u2014 a \u201cbenchmark for low\u2011carbon workplace delivery\u201d combining sustainability, aesthetics, and flexibility. (<a title=\"Xylo \u2014 The largest full timber structure in the UK\" href=\"https:\/\/xylo.london\/?utm_source=chatgpt.com\">Xylo<\/a>)<\/li>\n<\/ul>\n<p>In sum: the ambition is high \u2014 aiming to show that timber offices can meet modern demands of sustainability, comfort, design, and adaptability.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_What_This_Could_Mean_%E2%80%94_Potential_Benefits_Broader_Impacts\"><\/span>\u00a0What This Could Mean \u2014 Potential Benefits &amp; Broader Impacts<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li><strong>Carbon reduction<\/strong>: If succeeded, Xylo could significantly reduce embodied + operational carbon compared with typical offices \u2014 helping London (and the UK) move toward carbon\u2011neutral built environment.<\/li>\n<li><strong>Industry precedent<\/strong>: Success may encourage more developers to use mass\u2011timber for large offices (not just houses or low\u2011rise), influencing design and procurement norms in UK construction.<\/li>\n<li><strong>Workplace evolution<\/strong>: For employers\/tenants, timber\u2011based offices with terraces, gardens, and healthy materials may become more attractive \u2014 aligning with growing demand for sustainable, wellness\u2011oriented workspaces.<\/li>\n<li><strong>Flexibility &amp; longevity<\/strong>: Timber + modular design may make long\u2011term reconfiguration easier, extending building lifespan and reducing renovation waste \u2014 important in a fast\u2011changing real estate and workplace environment.<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_What_to_Watch_What_Could_Go_Wrong_%E2%80%94_Challenges_Risks\"><\/span>\u00a0What to Watch \/ What Could Go Wrong \u2014 Challenges &amp; Risks<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>While Xylo is ambitions and promising, there are factors that will determine whether it delivers on its full potential \u2014 or becomes a high\u2011profile experiment:<\/p>\n<ul>\n<li><strong>Supply-chain reliability<\/strong>: Construction depends on engineered timber (glulam, CLT) \u2014 supply must be consistent, high\u2011quality, and sourced sustainably. Any shortage, cost spike, or quality issue could disrupt timeline or budget.<\/li>\n<li><strong>Building code, fire safety, insurance &amp; durability concerns<\/strong>: Large timber buildings face stricter scrutiny than traditional steel\/concrete ones. Fire safety, acoustic performance, long\u2011term durability in urban environment will be watched carefully.<\/li>\n<li><strong>Market acceptance &amp; occupier demand<\/strong>: Even if built, will companies be comfortable leasing a timber\u2011based office? Will it attract tenants willing to pay possibly premium rents for \u201cgreen\u201d offices? If not, financial performance may suffer.<\/li>\n<li><strong>Scalability beyond flagship projects<\/strong>: Xylo may prove that timber works for a single high\u2011end office \u2014 but replicating at volume &amp; across different use\u2011cases (affordable offices, industrial, dense urban) is another matter. If supply, policy, cost or regulation doesn\u2019t adapt, this may remain niche.<\/li>\n<li><strong>Long\u2011term maintenance &amp; lifecycle unknowns<\/strong>: Timber buildings are newer at this scale \u2014 long\u2011term performance (moisture, structural stress, retrofit needs) remains to be seen. Maintenance, repairs, and long-term costs could differ from conventional buildings.<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_Broader_%E2%80%9CCase%E2%80%91Study_Context%E2%80%9D_Where_Xylo_Fits_Relative_to_Global_Timber_Projects\"><\/span>\u00a0Broader \u201cCase\u2011Study Context\u201d: Where Xylo Fits Relative to Global Timber Projects<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>To appreciate Xylo properly, it helps to see how timber\u2011building has evolved globally:<\/p>\n<ul>\n<li>The use of engineered timber (like glulam + CLT) for large buildings is already a trend internationally. For example, globally there are timber residential and mixed\u2011use towers proving that mass\u2011timber can scale beyond small houses. (See e.g. tall timber buildings in Scandinavia).<\/li>\n<li>In the UK, there are previous timber\u2011frame \/ engineered\u2011timber projects \u2014 especially residential \u2014 but few large-scale, central-London, commercial office buildings. Xylo may thus mark a turning point from \u201csmall-scale\/mid-rise timber\u201d to \u201cmajor commercial + urban\u201d timber architecture. (<a title=\"CONSTRUCTION\" href=\"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2023\/02\/Construction-Management-March-2023.pdf?utm_source=chatgpt.com\">Construction Management<\/a>)<\/li>\n<li>If successful and well-received, Xylo could influence building codes, construction norms, and developer confidence \u2014 potentially accelerating a broader shift toward timber and sustainable materials in UK commercial real estate.<\/li>\n<li>Here\u2019s a deeper look \u2014 with <strong>case studies, data, and stakeholder commentary<\/strong> \u2014 on the announcement that McLaren Construction has been selected to build what will be the UK\u2019s largest all\u2011timber office building. This includes what the project involves, why many in the industry are excited \u2014 and what some of the open questions are.\n<p><img decoding=\"async\" src=\"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2025\/11\/Xylo-1.jpg\" alt=\"Image\" \/><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.antiquemapsandprints.com\/cdn\/shop\/files\/P-6-014495a_db351993-12f2-4d27-9e6e-58816a7c260c.jpg?v=1748737883\" alt=\"Image\" \/><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2025\/11\/Xylo-exterior-Global-Holdings-Management-Group_1024x683_144dpi.webp\" alt=\"Image\" \/><\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_What_Xylo_is_%E2%80%94_key_facts_project_scope-2\"><\/span>\u00a0What Xylo is \u2014 key facts &amp; project scope<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li><strong>What &amp; where<\/strong>: The project \u2014 <strong>Xylo<\/strong> \u2014 will be built in central London, in the Clerkenwell area, on the corner of Gray\u2019s Inn Road and Clerkenwell Road. (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<li><strong>Size &amp; structure<\/strong>: The building will cover roughly <strong>100,000 sq ft<\/strong> (\u2248\u202f9,290\u202fm\u00b2) across <strong>nine storeys<\/strong>, using a full timber structural frame (glulam beams + cross\u2011laminated timber \/ CLT) supplied by a specialist supplier. (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<li><strong>Design &amp; amenities<\/strong>: According to the plan:\n<ul>\n<li>A vaulted lobby (6.5\u202fmetres high) as a central feature. (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<li>A \u201ctown\u2011hall\u201d space (bar\/lounge\/auditorium), a caf\u00e9\/restaurant, <strong>five landscaped terraces<\/strong>, a <strong>rooftop garden and yoga deck<\/strong>, cycle parking + shower facilities \u2014 intended to support healthy commuting and provide high-quality workplace amenities. (<a title=\"Global Holdings Management Group names McLaren Construction as contractor for Xylo, the UK\u2019s largest timber frame office scheme \u2013 Timber Media\" href=\"https:\/\/www.timbermedia.co.uk\/global-holdings-management-group-names-mclaren-construction-as-contractor-for-xylo-the-uks-largest-timber-frame-office-scheme\/?utm_source=chatgpt.com\">Timber Media<\/a>)<\/li>\n<li>Flexible workspace: the timber frame design allows layouts to be reconfigured over time, giving tenants flexibility as needs evolve. (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<\/ul>\n<\/li>\n<li><strong>Timeline<\/strong>: After enabling works the full build by McLaren is slated for completion in <strong>Q2 2028<\/strong>. (<a title=\"McLaren wins UK\u2019s largest timber frame office building | Construction Enquirer News\" href=\"https:\/\/www.constructionenquirer.com\/2025\/11\/26\/mclaren-wins-uks-largest-timber-frame-office-building\/?utm_source=chatgpt.com\">Construction Enquirer<\/a>)<\/li>\n<\/ul>\n<p>So Xylo is being positioned as a high-end, sustainable, future\u2011proof office building \u2014 combining modern amenities with green construction.<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_Why_It_Matters_%E2%80%94_What_Makes_This_Project_Stand_Out-2\"><\/span>\u00a0Why It Matters \u2014 What Makes This Project Stand Out<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"_Timber_sustainability_at_scale-2\"><\/span>\u00a0Timber &amp; sustainability at scale<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>The timber frame is not just aesthetic \u2014 it\u2019s part of a sustainability strategy. The structure will <strong>sequester over 2,400 tonnes of CO\u2082<\/strong>. (<a title=\"Global Holdings Management Group names McLaren Construction as contractor for Xylo, the UK\u2019s largest timber frame office scheme \u2013 Timber Media\" href=\"https:\/\/www.timbermedia.co.uk\/global-holdings-management-group-names-mclaren-construction-as-contractor-for-xylo-the-uks-largest-timber-frame-office-scheme\/?utm_source=chatgpt.com\">Timber Media<\/a>)<\/li>\n<li>Compared to typical new London offices, Xylo is targeting <strong>\u2248\u202f50% lower embodied carbon<\/strong>, and <strong>up to 82% lower operational carbon emissions<\/strong>. (<a title=\"McLaren Construction Appointed To Build UK\u2019s Largest All-Timber Office Building - PM Today\" href=\"https:\/\/www.pmtoday.co.uk\/mclaren-construction-appointed-to-build-uks-largest-all-timber-office-building\/?utm_source=chatgpt.com\">PM Today<\/a>)<\/li>\n<li>The building aims for high\u2011level certifications: LETI Pioneer, NABERS UK 5.5\u2011star, and BREEAM Excellent \u2014 underlining the ambition for sustainability and healthy workplaces. (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<\/ul>\n<p><strong>Why that matters<\/strong>: As concerns about climate change, embodied carbon in buildings, and sustainable urban development grow, Xylo may become a reference project \u2014 proving that large\u2011scale, high\u2011spec offices can be built primarily in timber without sacrificing quality or modern workplace standards.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"_Flexibility_future%E2%80%91proofing-2\"><\/span>\u00a0Flexibility &amp; future\u2011proofing<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Timber\u2011frame buildings with engineered wood (glulam \/ CLT) allow modular, reconfigurable interior layouts. For workplaces \u2014 with shifting tenant needs, hybrid working trends, or changing space demands \u2014 that flexibility can be a big advantage. (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<li>With amenities like terraces, garden, social areas, cycle &amp; commuter facilities \u2014 Xylo is designed not just for \u201cdesk space,\u201d but a modern \u201cworkplace experience,\u201d which aligns with evolving expectations of workers\/employers for healthy, sustainable, comfortable environments. (<a title=\"Global Holdings Management Group names McLaren Construction as contractor for Xylo, the UK\u2019s largest timber frame office scheme \u2013 Timber Media\" href=\"https:\/\/www.timbermedia.co.uk\/global-holdings-management-group-names-mclaren-construction-as-contractor-for-xylo-the-uks-largest-timber-frame-office-scheme\/?utm_source=chatgpt.com\">Timber Media<\/a>)<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"_Signalling_shift_for_UK_construction_real_estate-2\"><\/span>\u00a0Signalling shift for UK construction &amp; real estate<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Making the <strong>UK\u2019s \u201clargest all\u2011timber office building\u201d<\/strong> helps validate engineered timber (glulam\/CLT) at a scale and location where previously concrete\/steel dominated. This may spur more developers to consider timber for other large commercial developments. The announcement emphasizes the project \u201cstrengthens the case for large\u2011scale engineered timber office developments in the UK.\u201d (<a title=\"McLaren Construction appointed to deliver Xylo, the UK\u2019s largest all timber frame office building | Built Offsite\" href=\"https:\/\/builtoffsite.com.au\/news\/mclaren-construction-appointed-to-deliver-xylo-the-uks-largest-all-timber-frame-office-building\/?utm_source=chatgpt.com\">Built Offsite<\/a>)<\/li>\n<li>For occupiers and tenants \u2014 companies increasingly conscious of ESG (environmental, social, governance) credentials \u2014 such buildings may become more attractive. Xylo\u2019s blend of green credentials, modern amenities, and central London location could set a precedent for a new \u201cclass\u201d of sustainable offices. (<a title=\"McLaren appointed to deliver UK\u2019s 'largest\u2019 all-timber frame office | BE News\" href=\"https:\/\/benews.co.uk\/mclaren-appointed-to-deliver-uks-largest-all-timber-frame-office\/?utm_source=chatgpt.com\">BE News<\/a>)<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_What_People_Behind_the_Project_Are_Saying_%E2%80%94_Comments_Stakeholder_Perspectives-2\"><\/span>\u00a0What People Behind the Project Are Saying \u2014 Comments &amp; Stakeholder Perspectives<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li>From McLaren themselves: the firm\u2019s London &amp; South Managing Director described Xylo as \u201ca pioneering use of structural timber and off\u2011site manufacturing to deliver \u2026 sustainability on a typically tight central London site,\u201d calling it \u201ca landmark project that redefines what a sustainable, healthy workplace can be.\u201d (<a title=\"McLaren to build UK\u2019s largest timber-frame office in London - Construction Management\" href=\"https:\/\/constructionmanagement.co.uk\/mclaren-to-build-uks-largest-timber-frame-office-in-london\/?utm_source=chatgpt.com\">Construction Management<\/a>)<\/li>\n<li>From the developer, Global Holdings Management Group UK: their CEO called Xylo \u201ca game\u2011changing project \u2026 perfect for companies that are leaders in their fields,\u201d combining environmental technology with a prime urban location. (<a title=\"McLaren Construction To Build UK's Largest All-Timber Office | UK Construction News\" href=\"https:\/\/www.construction.co.uk\/construction-news\/325123\/mclaren-construction-to-build-uks-largest-all-timber-office?utm_source=chatgpt.com\">construction.co.uk<\/a>)<\/li>\n<li>The project team emphasises the role of modern timber construction and off\u2011site manufacturing (prefabrication), along with digital information management to monitor carbon performance during the build \u2014 suggesting a high degree of technical ambition and attention to sustainability, not just aesthetic timber office. (<a title=\"McLaren wins UK\u2019s largest timber frame office building | Construction Enquirer News\" href=\"https:\/\/www.constructionenquirer.com\/2025\/11\/26\/mclaren-wins-uks-largest-timber-frame-office-building\/?utm_source=chatgpt.com\">Construction Enquirer<\/a>)<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_Broader_%E2%80%9CCase%E2%80%91Study_Context%E2%80%9D_Where_Xylo_Fits_Relative_to_Other_Timber_Projects\"><\/span>\u00a0Broader \u201cCase\u2011Study Context\u201d: Where Xylo Fits Relative to Other Timber Projects<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li>Timber and engineered\u2011wood structures are increasingly used worldwide as an alternative to traditional steel\/concrete \u2014 especially where sustainability, speed of construction and occupant well\u2011being are priorities. (<a title=\"Engineered wood\" href=\"https:\/\/en.wikipedia.org\/wiki\/Engineered_wood?utm_source=chatgpt.com\">Wikipedia<\/a>)<\/li>\n<li>In London itself, there have been previous timber or hybrid timber\u2011office\/residential buildings \u2014 but many were smaller scale or residential. For example, some mass\u2011timber residential buildings and modest-scale office projects used CLT or engineered wood. (<a title=\"Stadthaus\" href=\"https:\/\/en.wikipedia.org\/wiki\/Stadthaus?utm_source=chatgpt.com\">Wikipedia<\/a>)<\/li>\n<li>Xylo appears to aim for a step\u2011change: combining mass\u2011timber structural engineering, high-spec interiors and amenities, and a large footprint \u2014 essentially \u201cbringing timber mainstream\u201d for large, high-end commercial offices. That could influence building\u2011codes, developer confidence, and design norms in the UK real estate sector.<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_What_Could_Go_Wrong_%E2%80%94_Risks_Challenges_What_to_Watch\"><\/span>\u00a0What Could Go Wrong \u2014 Risks, Challenges &amp; What to Watch<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>While Xylo is ambitious and promising, there are factors that will determine whether it delivers on its full potential \u2014 or becomes a high-profile experiment:<\/p>\n<ul>\n<li><strong>Supply chain and material sourcing risk<\/strong>: Timber (glulam, CLT) and associated engineered wood structural elements must meet high standards \u2014 supply delays, cost fluctuations, or quality issues (e.g. timber treatment, moisture control) might affect timeline or performance.<\/li>\n<li><strong>Regulatory, building\u2011code, fire safety and insurance questions<\/strong>: Large timber buildings sometimes face stricter scrutiny \u2014 particularly around fire safety, acoustic performance, structural longevity, and insurance. As the &#8220;largest all\u2011timber office,&#8221; Xylo may face such challenges during construction or occupancy.<\/li>\n<li><strong>Market acceptance &amp; tenant demand<\/strong>: Even though sustainable offices are increasingly popular, not all companies may be ready to commit to a timber\u2011based office, especially if they fear insurance or resale risks, or if rents\/premiums are higher than older conventional offices.<\/li>\n<li><strong>Scalability beyond flagship projects<\/strong>: It\u2019s one thing to build a landmark wooden office \u2014 but scaling timber construction across many buildings (residential and commercial) depends on timber supply, cost, labor skills, regulation, and long\u2011term maintenance viability.<\/li>\n<li><strong>Long-term performance &amp; maintenance<\/strong>: Timber buildings have different maintenance needs compared to concrete\/steel \u2014 moisture control, durability, wear and tear. As a high-end office, long-term occupant satisfaction, structural monitoring and maintenance regimes will matter.<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"_What_to_Watch_%E2%80%94_Whats_Next_What_I_Would_Monitor_Over_the_Next_Few_Years\"><\/span>\u00a0What to Watch \u2014 What\u2019s Next &amp; What I Would Monitor Over the Next Few Years<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>If you follow this sector, here are the key signals worth monitoring:<\/p>\n<ul>\n<li><strong>Progress of construction<\/strong>: whether McLaren hits timelines, and whether off\u2011site and timber delivery goes smoothly. Delays or structural challenges may influence perceptions of mass\u2011timber viability in large office builds.<\/li>\n<li><strong>Certification and performance<\/strong>: whether Xylo actually achieves LETI Pioneer, NABERS UK 5.5\u2011star and BREEAM Excellent \u2014 and whether energy performance and indoor environmental quality (e.g. air quality, occupant comfort) live up to the ambition.<\/li>\n<li><strong>Tenant uptake \/ leasing success<\/strong>: which companies move in, whether demand grows for timber offices, and whether occupiers value and prioritize sustainability enough to pay potential premium for such offices.<\/li>\n<li><strong>Follow\u2011up projects<\/strong>: if other developers commission similar mass\u2011timber office buildings after Xylo \u2014 that\u2019d signal a broader shift in UK commercial real estate.<\/li>\n<li><strong>Policy &amp; regulatory response<\/strong>: building codes, insurance industry, sustainability regulations may adapt \u2014 wider acceptance of timber-based offices may depend on regulatory support, clarity, and standards for safety and performance.<\/li>\n<\/ul>\n<hr \/>\n<p>&nbsp;<\/li>\n<\/ul>\n<hr \/>\n<ul>\n<li><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<hr \/>\n<ul>\n<li><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; \u00a0What is the project \u2014 basic facts about Xylo What &amp; where: Xylo is a nine\u2011storey office building in central London (Clerkenwell), on the&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,6],"tags":[],"class_list":["post-983252","post","type-post","status-publish","format-standard","hentry","category-gb-news","category-uk-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>McLaren Construction to deliver the UK&#039;s largest all-timber office building - UK News &amp; Updates<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"McLaren Construction to deliver the UK&#039;s largest all-timber office building - UK News &amp; Updates\" \/>\n<meta property=\"og:description\" content=\"&nbsp; \u00a0What is the project \u2014 basic facts about Xylo What &amp; where: Xylo is a nine\u2011storey office building in central London (Clerkenwell), on the...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/\" \/>\n<meta property=\"og:site_name\" content=\"UK News &amp; Updates\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-28T14:10:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2025\/11\/Xylo-1.jpg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/5529805dee92503827c0c27ed13d55a3\"},\"headline\":\"McLaren Construction to deliver the UK&#8217;s largest all-timber office building\",\"datePublished\":\"2025-11-28T14:10:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/\"},\"wordCount\":3356,\"publisher\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/#organization\"},\"image\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2025\/11\/Xylo-1.jpg\",\"articleSection\":[\"GB News\",\"UK News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/\",\"url\":\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/\",\"name\":\"McLaren Construction to deliver the UK's largest all-timber office building - UK News &amp; Updates\",\"isPartOf\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2025\/11\/Xylo-1.jpg\",\"datePublished\":\"2025-11-28T14:10:36+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#primaryimage\",\"url\":\"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2025\/11\/Xylo-1.jpg\",\"contentUrl\":\"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2025\/11\/Xylo-1.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ukpostcode.org\/content\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"McLaren Construction to deliver the UK&#8217;s largest all-timber office building\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#website\",\"url\":\"https:\/\/ukpostcode.org\/content\/\",\"name\":\"UK News &amp; Updates\",\"description\":\"UK Post Code\",\"publisher\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ukpostcode.org\/content\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#organization\",\"name\":\"UK News &amp; Updates\",\"url\":\"https:\/\/ukpostcode.org\/content\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ukpostcode.org\/content\/wp-content\/uploads\/2023\/09\/cropped-uk-logo-1.png\",\"contentUrl\":\"https:\/\/ukpostcode.org\/content\/wp-content\/uploads\/2023\/09\/cropped-uk-logo-1.png\",\"width\":307,\"height\":85,\"caption\":\"UK News &amp; Updates\"},\"image\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/5529805dee92503827c0c27ed13d55a3\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6aac6e3af4be1d6689e924bbaccd84fc0cc6c5f6680490dc6f0a1f09b87d57f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/6aac6e3af4be1d6689e924bbaccd84fc0cc6c5f6680490dc6f0a1f09b87d57f1?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/ukpostcode.org\/content\"],\"url\":\"https:\/\/ukpostcode.org\/content\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"McLaren Construction to deliver the UK's largest all-timber office building - UK News &amp; Updates","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/","og_locale":"en_US","og_type":"article","og_title":"McLaren Construction to deliver the UK's largest all-timber office building - UK News &amp; Updates","og_description":"&nbsp; \u00a0What is the project \u2014 basic facts about Xylo What &amp; where: Xylo is a nine\u2011storey office building in central London (Clerkenwell), on the...","og_url":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/","og_site_name":"UK News &amp; Updates","article_published_time":"2025-11-28T14:10:36+00:00","og_image":[{"url":"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2025\/11\/Xylo-1.jpg","type":"","width":"","height":""}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#article","isPartOf":{"@id":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/"},"author":{"name":"admin","@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/5529805dee92503827c0c27ed13d55a3"},"headline":"McLaren Construction to deliver the UK&#8217;s largest all-timber office building","datePublished":"2025-11-28T14:10:36+00:00","mainEntityOfPage":{"@id":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/"},"wordCount":3356,"publisher":{"@id":"https:\/\/ukpostcode.org\/content\/#organization"},"image":{"@id":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#primaryimage"},"thumbnailUrl":"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2025\/11\/Xylo-1.jpg","articleSection":["GB News","UK News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/","url":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/","name":"McLaren Construction to deliver the UK's largest all-timber office building - UK News &amp; Updates","isPartOf":{"@id":"https:\/\/ukpostcode.org\/content\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#primaryimage"},"image":{"@id":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#primaryimage"},"thumbnailUrl":"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2025\/11\/Xylo-1.jpg","datePublished":"2025-11-28T14:10:36+00:00","breadcrumb":{"@id":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#primaryimage","url":"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2025\/11\/Xylo-1.jpg","contentUrl":"https:\/\/constructionmanagement.co.uk\/wp-content\/uploads\/2025\/11\/Xylo-1.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/ukpostcode.org\/content\/mclaren-construction-to-deliver-the-uks-largest-all-timber-office-building\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ukpostcode.org\/content\/"},{"@type":"ListItem","position":2,"name":"McLaren Construction to deliver the UK&#8217;s largest all-timber office building"}]},{"@type":"WebSite","@id":"https:\/\/ukpostcode.org\/content\/#website","url":"https:\/\/ukpostcode.org\/content\/","name":"UK News &amp; Updates","description":"UK Post Code","publisher":{"@id":"https:\/\/ukpostcode.org\/content\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ukpostcode.org\/content\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ukpostcode.org\/content\/#organization","name":"UK News &amp; Updates","url":"https:\/\/ukpostcode.org\/content\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/logo\/image\/","url":"https:\/\/ukpostcode.org\/content\/wp-content\/uploads\/2023\/09\/cropped-uk-logo-1.png","contentUrl":"https:\/\/ukpostcode.org\/content\/wp-content\/uploads\/2023\/09\/cropped-uk-logo-1.png","width":307,"height":85,"caption":"UK News &amp; Updates"},"image":{"@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/5529805dee92503827c0c27ed13d55a3","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/6aac6e3af4be1d6689e924bbaccd84fc0cc6c5f6680490dc6f0a1f09b87d57f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6aac6e3af4be1d6689e924bbaccd84fc0cc6c5f6680490dc6f0a1f09b87d57f1?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/ukpostcode.org\/content"],"url":"https:\/\/ukpostcode.org\/content\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/posts\/983252","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/comments?post=983252"}],"version-history":[{"count":1,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/posts\/983252\/revisions"}],"predecessor-version":[{"id":983253,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/posts\/983252\/revisions\/983253"}],"wp:attachment":[{"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/media?parent=983252"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/categories?post=983252"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/tags?post=983252"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}