{"id":914707,"date":"2025-10-07T13:20:18","date_gmt":"2025-10-07T13:20:18","guid":{"rendered":"https:\/\/ukpostcode.org\/content\/?p=914707"},"modified":"2025-10-07T13:20:18","modified_gmt":"2025-10-07T13:20:18","slug":"mega-infrastructure-ai-cloud-startup-nscale-raises-155m","status":"publish","type":"post","link":"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/","title":{"rendered":"Mega infrastructure AI-cloud startup Nscale raises $155M"},"content":{"rendered":"<p>Nscale, a London-born startup positioning itself as a hyperscaler engineered specifically for artificial intelligence, announced in December 2024 that it raised $155 million in an oversubscribed Series A round. The investment \u2014 led by Sandton Capital Partners with participation from Kestrel 0x1, Blue Sky Capital Managers Ltd and Florence Capital \u2014 arrives at an inflection point for AI infrastructure. Demand for large-scale GPU compute is booming, and Nscale\u2019s vertically integrated strategy \u2014 owning data centers, designing GPU-optimised facilities and providing a tailored software and hardware stack \u2014 is a direct bet on that market pressure. (<a title=\"AI hyperscaler Nscale secures $155 million in Series A\" href=\"https:\/\/www.nscale.com\/press-releases\/ai-hyperscaler-nscale-secures-usd-155-million-in-series-a?utm_source=chatgpt.com\">nscale.com<\/a>)<\/p>\n<p>The round is notable for both its size and timing. A $155 million Series A is uncommon in the infrastructure space where capital requirements are huge and investors are cautious about long, cap-intensive buildouts. For Nscale, which emerged from stealth in mid-2024, the cash injection gives the company runway to accelerate its European and North American expansion plans, and to scale the physical power and cooling infrastructure that modern AI workloads demand. The company has publicly framed the raise as the start of a multi-phase plan to build an AI hyperscaler capable of supporting training runs for very large models and dense inference workloads. (<a title=\"Nscale raises $155m in funding to power AI cloud roll-out\" href=\"https:\/\/www.datacenterdynamics.com\/en\/news\/nscale-raises-155m-in-funding-to-power-ai-cloud-roll-out\/?utm_source=chatgpt.com\">Data Center Dynamics<\/a>)<\/p>\n<p>Why investors are willing to commit large sums to AI infrastructure is straightforward: generative AI and large language models changed the economics of compute. Cloud customers today are not simply buying general-purpose virtual machines \u2014 they want access to huge clusters of GPUs, high-bandwidth networking, and facilities that can deliver consistent, high-density power while minimising energy costs and emissions. Nscale\u2019s pitch is to provide sovereign, regional compute capacity that can be scaled on demand for model training and inference \u2014 a proposition that appeals to enterprises, research institutions and cloud partners wary of centralised hyperscalers or sensitive to data sovereignty. (<a title=\"AI hyperscaler Nscale secures $155 million in Series A\" href=\"https:\/\/www.nscale.com\/press-releases\/ai-hyperscaler-nscale-secures-usd-155-million-in-series-a?utm_source=chatgpt.com\">nscale.com<\/a>)<\/p>\n<p>Nscale\u2019s strategy blends three pillars: real estate and data-center operations, hardware provisioning (GPUs and racks optimised for AI), and a software stack that helps customers deploy large, distributed workloads. This vertical integration echoes the playbooks of other infrastructure providers that aim to reduce cost-per-training-run by controlling more of the stack. For Nscale this means designing facilities primarily for high-density GPU clusters \u2014 which have different cooling and electrical requirements than traditional server farms \u2014 and pairing that with scheduling and orchestration tools so customers can spin up superclusters with less friction. The company claims its designs and operational model deliver higher utilisation and lower real-world cost for AI training than repurposed commodity data centers. (<a title=\"Nscale Looks to Raise US$2.7bn to Build AI Infrastructure\" href=\"https:\/\/datacentremagazine.com\/data-centres\/nscale-looks-to-raise-us-2-7bn-to-build-ai-infrastructure?utm_source=chatgpt.com\">Data Centre Magazine<\/a>)<\/p>\n<p>The new capital was explicitly earmarked for geographic expansion and to grow a planned pipeline of sites. Public statements from the company indicate Nscale is targeting a dramatic scale-up: moving from hundreds of megawatts of capacity to a multi-gigawatt pipeline over several years. That ambition reflects both the opportunity and the challenge: sourcing land, grid connections and favourable power contracts \u2014 ideally renewable \u2014 is a slow, regulatory-and-supply-chain-intensive process, but it\u2019s also a moat. Investors backing Nscale appear to view the combination of capital, talent and early site control as a defensible advantage in what is rapidly becoming a regional arms race for AI compute. (<a title=\"Nscale Looks to Raise US$2.7bn to Build AI Infrastructure\" href=\"https:\/\/datacentremagazine.com\/data-centres\/nscale-looks-to-raise-us-2-7bn-to-build-ai-infrastructure?utm_source=chatgpt.com\">Data Centre Magazine<\/a>)<\/p>\n<p>Leadership and background matter. Nscale launched from stealth in 2024 and quickly articulated a thesis that the next wave of cloud needs bespoke infrastructure \u2014 a contrast to the multi-tenant, general compute model that dominated the previous decade. Founders and early executives leaned on experience in energy, data-centers and systems engineering to frame the company as a pragmatic builder rather than a pure software play. That credibility likely helped the company secure lead investors comfortable with capital-intensive infrastructure projects. The presence of financial backers with energy and infrastructure expertise signals that the round was more than a bet on a software layer; it was a commitment to physical buildout. (<a title=\"Nscale $155M Series A: Words from the CEO\" href=\"https:\/\/www.nscale.com\/blog\/nscale-155m-series-a-words-from-the-ceo?utm_source=chatgpt.com\">nscale.com<\/a>)<\/p>\n<p>A closer look at the investor syndicate illuminates strategy. Sandton Capital Partners, the lead, is known for growth investments in capital-intensive businesses. Participation from funds such as Kestrel and Blue Sky Capital Managers suggests interest from investors focused on long-term infrastructure returns and, possibly, energy transition themes. That mix of backers aligns with Nscale\u2019s dual positioning: it is both an energy-aware data-centre operator and a provider of mission-critical compute for AI. The round\u2019s structure \u2014 oversubscribed and led by a specialist investor \u2014 indicates strong appetite and a measure of validation for the company\u2019s roadmap. (<a title=\"AI hyperscaler Nscale secures $155 million in Series A\" href=\"https:\/\/www.nscale.com\/press-releases\/ai-hyperscaler-nscale-secures-usd-155-million-in-series-a?utm_source=chatgpt.com\">nscale.com<\/a>)<\/p>\n<p>Operationally, the key metrics to watch for Nscale will be power pipeline secured (megawatts connected), the pace of rack and GPU deployment, and customer commitments. Unlike a pure software start-up where revenue scales rapidly with low incremental cost, Nscale must demonstrate that each megawatt of invested capacity will attract enough high-margin usage to justify the capital. The company\u2019s public materials signpost a target of high utilisation through partnerships with model owners and cloud resellers; the bigger the committed usage agreements, the clearer the path to unit economics that appeal to infrastructure investors. (<a title=\"Nscale raises $155m in funding to power AI cloud roll-out\" href=\"https:\/\/www.datacenterdynamics.com\/en\/news\/nscale-raises-155m-in-funding-to-power-ai-cloud-roll-out\/?utm_source=chatgpt.com\">Data Center Dynamics<\/a>)<\/p>\n<p>Competition is fierce. On one side are the incumbent hyperscalers that already offer GPU instances at scale; on the other are specialised players (CoreWeave, Lambda, CoreWeave\u2019s rivals) and national champions building sovereign options. Nscale\u2019s angle is to sit between these poles: provide the scale and customised engineering of a hyperscaler while remaining regionally anchored and energy-focused. That value proposition resonates differently across customers: hyperscalers may undercut on price thanks to vertical integration, but for governments and enterprises with data sovereignty or sustainability mandates, a regional, renewable-powered alternative is attractive. The strategic trade-off for Nscale is to grow quickly enough to capture market share without overextending capital on underutilised capacity. (<a title=\"Mega deals: Which UK tech startups raised \u00a3100M ...\" href=\"https:\/\/techfundingnews.com\/mega-deals-which-uk-tech-startups-raised-100m-funding\/?utm_source=chatgpt.com\">Tech Funding News<\/a>)<\/p>\n<p>There are real technical questions to solve. Scaling an AI hyperscaler requires not just racks of GPUs, but software for distributed training, high-speed, low-latency interconnects, and efficient cooling and power management. Nscale has signalled an intent to build or operate parts of this stack rather than rely entirely on third parties. Doing so can reduce margins for customers but also raises the company\u2019s execution bar: hardware procurement (particularly for GPUs constrained by supply chains), networking design, and power procurement are each long, lumpy undertakings that have tripped up other ambitious builders. The $155 million will help, but success will hinge on execution across real estate, energy contracting and systems engineering. (<a title=\"Nscale Looks to Raise US$2.7bn to Build AI Infrastructure\" href=\"https:\/\/datacentremagazine.com\/data-centres\/nscale-looks-to-raise-us-2-7bn-to-build-ai-infrastructure?utm_source=chatgpt.com\">Data Centre Magazine<\/a>)<\/p>\n<p>Sustainability is a recurring theme in Nscale\u2019s messaging. AI compute is electricity-hungry \u2014 modern training runs can consume megawatt-hours at model scale \u2014 and customers increasingly demand proof of renewable sourcing to satisfy ESG policies and, in some cases, regulatory requirements. Nscale emphasises site selection in regions with access to renewable power and hydropower, and has framed its builds as part of a broader strategy to reduce the carbon intensity of AI compute. This is not just greenwashing: access to low-cost, renewable energy is a commercial lever that can materially improve margins on compute sold by the megawatt. (<a title=\"Nscale Looks to Raise US$2.7bn to Build AI Infrastructure\" href=\"https:\/\/datacentremagazine.com\/data-centres\/nscale-looks-to-raise-us-2-7bn-to-build-ai-infrastructure?utm_source=chatgpt.com\">Data Centre Magazine<\/a>)<\/p>\n<p>From a market perspective, Nscale\u2019s raise fits a broader pattern of capital flowing into AI infrastructure across 2024\u20132025. Investors \u2014 including corporates such as chipmakers and energy groups \u2014 are seeking exposure to the infrastructure layer underpinning generative AI. For entrepreneurs, the rule of thumb has become clear: you must either achieve extremely efficient utilisation of general data-centre capacity or build highly specialised facilities where your engineering choices materially reduce cost and latency for AI workloads. Nscale is explicitly choosing the latter route. (<a title=\"Mega deals: Which UK tech startups raised \u00a3100M ...\" href=\"https:\/\/techfundingnews.com\/mega-deals-which-uk-tech-startups-raised-100m-funding\/?utm_source=chatgpt.com\">Tech Funding News<\/a>)<\/p>\n<p>For customers, what matters most will be price, latency and availability. Training large models requires both contiguous GPU capacity and fast networking; inference workloads require global availability and predictable performance. Nscale\u2019s value will be proven if it can offer a combination of attractive price per GPU-hour, low end-to-end latency for distributed training and transparent sustainability credentials. Early adopter deals \u2014 whether with research labs, start-ups building LLMs, or enterprise AI divisions \u2014 will be critical validation points. (<a title=\"Nscale raises $155m in funding to power AI cloud roll-out\" href=\"https:\/\/www.datacenterdynamics.com\/en\/news\/nscale-raises-155m-in-funding-to-power-ai-cloud-roll-out\/?utm_source=chatgpt.com\">Data Center Dynamics<\/a>)<\/p>\n<p>The raise also highlights a recurring industry tension: building sovereign or regional AI infrastructure can appease regulators and enterprise customers, but it fragments scale. Large global models prefer centralized, enormous pools of compute for efficiency; by contrast, regional compute creates silos that can be more expensive per unit. Nscale\u2019s challenge is to offer an API-level experience that masks geography for customers when desirable, while still delivering true regional sovereignty and sustainability when needed. If it strikes that balance, it can occupy a valuable niche between hyperscalers and small specialised providers. (<a title=\"AI hyperscaler Nscale secures $155 million in Series A\" href=\"https:\/\/www.nscale.com\/press-releases\/ai-hyperscaler-nscale-secures-usd-155-million-in-series-a?utm_source=chatgpt.com\">nscale.com<\/a>)<\/p>\n<p>What to watch next: milestones that will convert investor confidence into durable business value. First, site announcements and megawatt hookups \u2014 concrete proof that the company is turning its pipeline into connected capacity. Second, strategic partnerships with model owners, software providers or cloud platforms that commit usage. Third, procurement wins for GPUs and networking gear that show Nscale can navigate constrained supply markets and lock in favorable terms. Finally, early financial metrics \u2014 revenue per rack, utilisation and gross margins \u2014 will reveal whether the integration of real estate, hardware and software delivers the economics investors expect. (<a title=\"Nscale raises $155m in funding to power AI cloud roll-out\" href=\"https:\/\/www.datacenterdynamics.com\/en\/news\/nscale-raises-155m-in-funding-to-power-ai-cloud-roll-out\/?utm_source=chatgpt.com\">Data Center Dynamics<\/a>)<\/p>\n<p>In sum, Nscale\u2019s $155 million Series A is both a statement and an instrument: it declares a belief in a future where AI demands bespoke, regional infrastructure, and it provides the capital needed to pursue that ambition. The bet is significant and understandable \u2014 AI workloads are a fast-growing, high-value market \u2014 yet building a hyperscaler is among the most difficult endeavors in tech. Execution across land, power, supply chains and software will determine whether Nscale becomes a durable alternative to the big clouds or a cautionary tale about the costs of scaling physical infrastructure too quickly. For now, investors have placed a sizeable wager; the coming 12\u201324 months will tell if the company can translate capital into connected, highly utilised, and profitable compute. (<a title=\"AI hyperscaler Nscale secures $155 million in Series A\" href=\"https:\/\/www.nscale.com\/press-releases\/ai-hyperscaler-nscale-secures-usd-155-million-in-series-a?utm_source=chatgpt.com\">nscale.com<\/a>)<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_73 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/#Nscales_Case_Items_Comments\" title=\"Nscale\u2019s Case Items &amp; Comments\">Nscale\u2019s Case Items &amp; Comments<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/#Comparative_External_Case_Studies_Examples\" title=\"Comparative \/ External Case Studies &amp; Examples\">Comparative \/ External Case Studies &amp; Examples<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/#Examples_Mini_Case_Studies_of_Specific_Deployments_or_Scenarios\" title=\"Examples \/ Mini Case Studies of Specific Deployments or Scenarios\">Examples \/ Mini Case Studies of Specific Deployments or Scenarios<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/#Risks_Trade-Offs_What_Could_Go_Wrong\" title=\"Risks, Trade-Offs &amp; What Could Go Wrong\">Risks, Trade-Offs &amp; What Could Go Wrong<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/#What_Nscale_Must_Do_to_Maximize_Their_Chances\" title=\"What Nscale Must Do to Maximize Their Chances\">What Nscale Must Do to Maximize Their Chances<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Nscales_Case_Items_Comments\"><\/span>Nscale\u2019s Case Items &amp; Comments<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Before jumping to external examples, here are some specific details, internal \u201ccase-studies\u201d or features and comments from Nscale\u2019s own announcement and public commentary that help illustrate their strategy and what they are betting on:<\/p>\n<table>\n<thead>\n<tr>\n<th>Feature \/ Claim<\/th>\n<th>What Nscale is doing, and what that shows in practice<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Vertically integrated infrastructure<\/strong><\/td>\n<td>Nscale is building and owning its own data centres (greenfield sites), designing GPU superclusters and also offering software\/scheduling stack. (<a title=\"AI hyperscaler Nscale secures $155 million in Series A | Press Release | Nscale\" href=\"https:\/\/www.nscale.com\/press-releases\/ai-hyperscaler-nscale-secures-usd-155-million-in-series-a?utm_source=chatgpt.com\">nscale.com<\/a>) <em>Implication:<\/em> they believe controlling more layers (land, power, cooling, racks, GPU hardware, orchestration) gives unit cost, performance and speed-to-market advantages. But it raises execution risk (every layer must perform well).<\/td>\n<\/tr>\n<tr>\n<td><strong>Large pipeline of power &amp; sites<\/strong><\/td>\n<td>They\u2019ve grown from 300 MW to 1.3 GW of greenfield data centre pipeline. Planned development of 120 MW in 2025. (<a title=\"AI hyperscaler Nscale secures $155 million in Series A | Press Release | Nscale\" href=\"https:\/\/www.nscale.com\/press-releases\/ai-hyperscaler-nscale-secures-usd-155-million-in-series-a?utm_source=chatgpt.com\">nscale.com<\/a>) <em>Implication:<\/em> They are preparing for scale, and trying to lock in supply of land, grid power, cooling and electricity contracts before those become bottlenecks (since power availability is a common constraint).<\/td>\n<\/tr>\n<tr>\n<td><strong>Efficiency &amp; advanced cooling<\/strong><\/td>\n<td>Use of closed-loop direct liquid cooling, high rack densities (they mention requirements such as \u201c150 kW per rack\u201d and density constraints). (<a title=\"Nscale $155M Series A: Words from the CEO | Nscale\" href=\"https:\/\/www.nscale.com\/blog\/nscale-155m-series-a-words-from-the-ceo?utm_source=chatgpt.com\">nscale.com<\/a>) <em>Implication:<\/em> To support next-gen GPUs (which use more power, produce more heat) efficiently, cooling, power delivery, thermal design are critical.<\/td>\n<\/tr>\n<tr>\n<td><strong>Sustainability \/ renewable energy<\/strong><\/td>\n<td>Their centres are \u201cAI-ready,\u201d \u201csustainable,\u201d with 100% renewable power in some sites (e.g. Norway). (<a title=\"AI hyperscaler Nscale secures $155 million in Series A | Press Release | Nscale\" href=\"https:\/\/www.nscale.com\/press-releases\/ai-hyperscaler-nscale-secures-usd-155-million-in-series-a?utm_source=chatgpt.com\">nscale.com<\/a>) <em>Implication:<\/em> not just marketing \u2014 energy cost and ESG are materially relevant (electricity is one of the biggest costs; regulatory and customer pressures for greener compute are rising).<\/td>\n<\/tr>\n<tr>\n<td><strong>Customer demand &amp; timing<\/strong><\/td>\n<td>They report \u201cinsatiable demand\u201d since launch in May 2024; launching their public cloud and inference services in Q1 2025. (<a title=\"AI hyperscaler Nscale secures $155 million in Series A | Press Release | Nscale\" href=\"https:\/\/www.nscale.com\/press-releases\/ai-hyperscaler-nscale-secures-usd-155-million-in-series-a?utm_source=chatgpt.com\">nscale.com<\/a>) <em>Implication:<\/em> Getting early traction is critical and may help in securing early revenue and validating their unit economics.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>From CEO Josh Payne\u2019s commentary: the key risks he sees are scarcity of large contiguous power, the need for high rack power density, and limitations of many existing colocation centres in meeting these new requirements. They believe their approach (owning and designing the site + cooling + hardware + software) counters those risks. (<a title=\"Nscale $155M Series A: Words from the CEO | Nscale\" href=\"https:\/\/www.nscale.com\/blog\/nscale-155m-series-a-words-from-the-ceo?utm_source=chatgpt.com\">nscale.com<\/a>)<\/p>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Comparative_External_Case_Studies_Examples\"><\/span>Comparative \/ External Case Studies &amp; Examples<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>To understand how Nscale\u2019s strategy stacks up, here are some other AI infrastructure or hyperscaler examples. Some are direct competitors, others provide contrast; each comes with lessons.<\/p>\n<table>\n<thead>\n<tr>\n<th>Case \/ Company<\/th>\n<th>What they do &amp; lessons relevant to Nscale<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>CoreWeave<\/strong><\/td>\n<td>CoreWeave is one of the major specialized AI infrastructure providers in the U.S. They supply GPU cloud compute (esp. for training large models) and have been scaling data centres rapidly. <strong>Lessons for Nscale:<\/strong> Being early in offering GPU-specialized infrastructure gives a strong advantage, especially when demand from AI-model-owners (e.g. for large LLM training or inference) is surging. Strategic partnerships and contracts matter: long-term deals with big customers help lock demand and make the capital deployment less risky. Maintaining high utilization is critical; empty racks or under-used power are very costly. Geographic expansion and regulatory\/energy access become challenges: power cost and stability, temperature\/cooling, local permits, etc. If Nscale can shore up those, they have strong potential.<\/td>\n<\/tr>\n<tr>\n<td><strong>Yotta \/ Sustainable AI Cloud (from WEKA case study)<\/strong><\/td>\n<td>The \u201cYotta Shakti Cloud\u201d case (by WEKA) shows work in combining high-GPU performance with sustainability (efficient cooling, renewable energy, optimized network and storage stack). (<a title=\"CASE STUDY\" href=\"https:\/\/www.weka.io\/wp-content\/uploads\/files\/resources\/2024\/10\/weka-yotta-sustainable-ai-infrastructure.pdf?utm_source=chatgpt.com\">WEKA<\/a>) <strong>Lessons:<\/strong> Even for high-performance compute, sustainability isn\u2019t just a \u201cnice to have\u201d: energy usage, cooling efficiency, waste heat, etc., materially affect operational costs and regulatory\/social acceptability. Infrastructure architecture (how you build your storage, how you cool, how you interconnect) plays a big role in both performance (latency, throughput) and costs. Partnerships (e.g. with platform\/software providers) to optimize end-to-end performance help.<\/td>\n<\/tr>\n<tr>\n<td><strong>Oracle\u2019s EU investment in AI infrastructure<\/strong><\/td>\n<td>Oracle announced multi-billion dollar investments in Germany and Netherlands to expand AI &amp; cloud data centre capacity to meet regulatory\/local demand. (<a title=\"Oracle to Spend $3B in Germany, Netherlands on Cloud, AI Infrastructure\" href=\"https:\/\/www.investopedia.com\/oracle-to-spend-3b-in-germany-netherlands-on-cloud-ai-infrastructure-11772213?utm_source=chatgpt.com\">Investopedia<\/a>) <strong>Lessons:<\/strong> Sovereignty \/ regulatory compliance is a rising factor: customers in Europe want data local, under local regulation. Large incumbents with deep resources can drive costs, put pressure on smaller players; the local\/regional players must find niches (energy efficiency, cost, special compliance, custom hardware etc.). Time to market in Europe can be slower (permitting, energy grid, land); pipeline and regulatory risk are real.<\/td>\n<\/tr>\n<tr>\n<td><strong>AWS \/ Azure \/ Google hyperscalers<\/strong><\/td>\n<td>Big clouds have long operated GPU and specialized AI compute offerings. Their advantages: massive scale, deep pockets, existing network and power procurement, broad ecosystem. <strong>Lessons:<\/strong> Economies of scale: power, hardware purchases (GPUs, networking), software engineering all benefit. But they are sometimes less nimble: modifying cooling, deploying new GPU architectures, or building new sites in constrained regions is slower; often bounded by legacy infrastructure. For specialized AI workloads (ultra-dense, high power, constrained latency), they may not always be optimal; that\u2019s the gap companies like Nscale look to fill.<\/td>\n<\/tr>\n<tr>\n<td><strong>Modular (AI infra \/ abstraction layer example)<\/strong><\/td>\n<td>As another startup, Modular is offering platform-oriented AI infrastructure\/abstractions to allow developers to deploy across different hardware without rewriting code. (<a title=\"Silicon Valley's Modular: How Aussie Tim Davis built $2.4bn AI unicorn\" href=\"https:\/\/www.theaustralian.com.au\/business\/technology\/silicon-valleys-new-ai-software-star-is-modular-cofounder-tim-davis\/news-story\/f31a02e38c0e35e2f0dd5eb32ab4f189?utm_source=chatgpt.com\">The Australian<\/a>) <strong>Lessons:<\/strong> There\u2019s demand not just for raw GPU capacity, but also for software abstractions, compatibility, portability. Infrastructure is necessary but not sufficient; the developer experience, tools, orchestration, deployment pipelines matter. If Nscale can provide not only hardware + power but also smooth software stack, SDKs, orchestration, that improves adoption, reduces friction. Competitive pressure increases: many players will try to optimize similar stacks; differentiation may come from speed of deployment, closeness to customer needs, energy cost, and regulatory features (e.g. data locality, privacy).<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Examples_Mini_Case_Studies_of_Specific_Deployments_or_Scenarios\"><\/span>Examples \/ Mini Case Studies of Specific Deployments or Scenarios<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>To make this concrete, here are hypothetical or real-world example scenarios, and how Nscale\u2019s approach would perform vs alternatives. These help highlight what matters in action.<\/p>\n<ol>\n<li><strong>Academic \/ Research Institution training a very large model (10-100B parameters)<\/strong>\n<ul>\n<li>Needs: very large GPU cluster, uninterrupted power, high throughput storage, low latency network among racks, support for new GPU architectures, efficient cooling.<\/li>\n<li>Challenge: many colocation centres cannot provide enough contiguous power, or high rack density; costs are high; procurement delays.<\/li>\n<li>Nscale advantage: by owning data centres with greenfield design, closed-loop liquid cooling etc., they can build the facility to meet those needs exactly, perhaps more cheaply and with better thermal performance. If research customer needs cluster in Europe (for data sovereignty or latency), Nscale is well positioned.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Enterprise deploying inference at scale (e.g. model serving globally)<\/strong>\n<ul>\n<li>Needs: low latency for users, reliability, elasticity, cost control, perhaps minimal carbon footprint for public image.<\/li>\n<li>Challenge: scaling inference is different from training; inference often more distributed, possibly needing edge or regional centres; also hardware utilization is often more bursty. Pricing per GPU-hour or per inference becomes sensitive.<\/li>\n<li>Nscale might compete if they provide regional points of presence, good software stack, predictable pricing; especially appealing if enterprise wants regionally sovereign or renewable-powered data centres.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Sovereign or regulatory use cases<\/strong> (government, health, regulated data)\n<ul>\n<li>Needs: local data storage, compliance, security, reliability, possibly certified infrastructure; special latency, uptime, jurisdictional constraints.<\/li>\n<li>Challenge: many cloud providers offer these, but sometimes via small zones; but having local, dedicated infrastructure is expensive.<\/li>\n<li>Nscale could win these if its greenfield sites in Europe\/North America meet local regulations, allow for dedicated GPU clusters, and are transparent about energy, data protection, etc.<\/li>\n<\/ul>\n<\/li>\n<li><strong>A startup building a gen-AI application<\/strong>\n<ul>\n<li>Needs: ability to experiment\/dev\/test cheaply, then scale to training\/fine-tuning, maybe inference; sometimes unpredictable usage.<\/li>\n<li>Challenge: high cost to spin up large clusters, overhead, delays if you depend on existing providers with limited supply.<\/li>\n<li>Nscale\u2019s planned public cloud, inference services, serverless or virtualised nodes, might make this path more accessible; if the pricing is competitive and onboarding is easy, they could serve this class of customer well.<\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"Risks_Trade-Offs_What_Could_Go_Wrong\"><\/span>Risks, Trade-Offs &amp; What Could Go Wrong<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>It\u2019s useful to contrast the opportunity with what might derail a strategy like Nscale\u2019s. Some pitfalls seen in other infrastructure builds:<\/p>\n<ul>\n<li><strong>Power \/ grid constraints<\/strong>: Procuring large, contiguous power, ensuring grid reliability, negotiating favorable renewable energy deals can take years and are often subject to regulatory or local objections.<\/li>\n<li><strong>Cooling \/ build delays<\/strong>: Advanced cooling technologies (liquid cooling etc.) need specialty design, rugged hardware, and skilled labor; delays in construction, procurement (GPUs, racks, networking) can slow ramp-up.<\/li>\n<li><strong>GPU hardware supply &amp; diversity<\/strong>: Dependence on particular GPU vendors can expose to supply constraints, price increases, or vendor IP\/licensing issues. Having to support next-gen GPUs that need special power\/cooling can force redesigns.<\/li>\n<li><strong>Utilization risk<\/strong>: Even once built, data centers and clusters must be filled with workloads. Poor utilization means capital sits idle. Committing to customers ahead of time (via contracts) helps, but it\u2019s hard.<\/li>\n<li><strong>Competition from incumbents<\/strong>: Big cloud providers can undercut on price, especially in regions they\u2019ve heavily invested in. Their existing economies of scale, supply chain leverage, and customer base are strong advantages.<\/li>\n<li><strong>Regulation, permitting, environmental opposition<\/strong>: Local communities sometimes resist large power or data centre builds; permitting can introduce delays; environmental regulation may tighten.<\/li>\n<li><strong>Cost inflation<\/strong>: Land, power, materials, labor all have cost inflation risk; plus energy cost volatility; these affect operational cost and margins.<\/li>\n<\/ul>\n<hr \/>\n<h2><span class=\"ez-toc-section\" id=\"What_Nscale_Must_Do_to_Maximize_Their_Chances\"><\/span>What Nscale Must Do to Maximize Their Chances<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Based on comparing their plan and what has tripped others up, here are some \u201cmusts\u201d for Nscale:<\/p>\n<ol>\n<li><strong>Lock in power and renewable energy contracts early<\/strong>, with favorable pricing, to reduce volatility in operating costs. Securing cheap and renewable power is a competitive lever.<\/li>\n<li><strong>Ensure hardware procurement is diversified\/forward-contracted<\/strong> so that delays or monopoly pricing in GPU supply are mitigated.<\/li>\n<li><strong>Secure anchor customers<\/strong> with long-term commitments (enterprises, governments, research labs) to ensure utilization, before or during build.<\/li>\n<li><strong>Optimize cooling, thermal design, interconnects<\/strong> to match next-gen GPU demands; ensure efficiency to reduce both capex and opex.<\/li>\n<li><strong>Develop a sticky software \/ orchestration stack<\/strong> so switching costs for customers are high; make onboarding, scaling, inference\/training pipelines easy.<\/li>\n<li><strong>Careful geographic expansion<\/strong> ensuring regulatory and local infrastructure support (grid stability, land, cooling, permits); not pushing too fast without site readiness.<\/li>\n<li><strong>Transparent sustainability metrics<\/strong> and compliance, to appeal to customers, capital providers, and avoid regulatory risk.<\/li>\n<\/ol>\n<hr \/>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nscale, a London-born startup positioning itself as a hyperscaler engineered specifically for artificial intelligence, announced in December 2024 that it raised $155 million in an&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,6],"tags":[],"class_list":["post-914707","post","type-post","status-publish","format-standard","hentry","category-gb-news","category-uk-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Mega infrastructure AI-cloud startup Nscale raises $155M - UK News &amp; Updates<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mega infrastructure AI-cloud startup Nscale raises $155M - UK News &amp; Updates\" \/>\n<meta property=\"og:description\" content=\"Nscale, a London-born startup positioning itself as a hyperscaler engineered specifically for artificial intelligence, announced in December 2024 that it raised $155 million in an...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/\" \/>\n<meta property=\"og:site_name\" content=\"UK News &amp; Updates\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-07T13:20:18+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/5529805dee92503827c0c27ed13d55a3\"},\"headline\":\"Mega infrastructure AI-cloud startup Nscale raises $155M\",\"datePublished\":\"2025-10-07T13:20:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/\"},\"wordCount\":3295,\"publisher\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/#organization\"},\"articleSection\":[\"GB News\",\"UK News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/\",\"url\":\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/\",\"name\":\"Mega infrastructure AI-cloud startup Nscale raises $155M - UK News &amp; Updates\",\"isPartOf\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/#website\"},\"datePublished\":\"2025-10-07T13:20:18+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ukpostcode.org\/content\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mega infrastructure AI-cloud startup Nscale raises $155M\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#website\",\"url\":\"https:\/\/ukpostcode.org\/content\/\",\"name\":\"UK News &amp; Updates\",\"description\":\"UK Post Code\",\"publisher\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ukpostcode.org\/content\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#organization\",\"name\":\"UK News &amp; Updates\",\"url\":\"https:\/\/ukpostcode.org\/content\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ukpostcode.org\/content\/wp-content\/uploads\/2023\/09\/cropped-uk-logo-1.png\",\"contentUrl\":\"https:\/\/ukpostcode.org\/content\/wp-content\/uploads\/2023\/09\/cropped-uk-logo-1.png\",\"width\":307,\"height\":85,\"caption\":\"UK News &amp; Updates\"},\"image\":{\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/5529805dee92503827c0c27ed13d55a3\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6aac6e3af4be1d6689e924bbaccd84fc0cc6c5f6680490dc6f0a1f09b87d57f1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/6aac6e3af4be1d6689e924bbaccd84fc0cc6c5f6680490dc6f0a1f09b87d57f1?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/ukpostcode.org\/content\"],\"url\":\"https:\/\/ukpostcode.org\/content\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mega infrastructure AI-cloud startup Nscale raises $155M - UK News &amp; Updates","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/","og_locale":"en_US","og_type":"article","og_title":"Mega infrastructure AI-cloud startup Nscale raises $155M - UK News &amp; Updates","og_description":"Nscale, a London-born startup positioning itself as a hyperscaler engineered specifically for artificial intelligence, announced in December 2024 that it raised $155 million in an...","og_url":"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/","og_site_name":"UK News &amp; Updates","article_published_time":"2025-10-07T13:20:18+00:00","author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/#article","isPartOf":{"@id":"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/"},"author":{"name":"admin","@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/5529805dee92503827c0c27ed13d55a3"},"headline":"Mega infrastructure AI-cloud startup Nscale raises $155M","datePublished":"2025-10-07T13:20:18+00:00","mainEntityOfPage":{"@id":"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/"},"wordCount":3295,"publisher":{"@id":"https:\/\/ukpostcode.org\/content\/#organization"},"articleSection":["GB News","UK News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/","url":"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/","name":"Mega infrastructure AI-cloud startup Nscale raises $155M - UK News &amp; Updates","isPartOf":{"@id":"https:\/\/ukpostcode.org\/content\/#website"},"datePublished":"2025-10-07T13:20:18+00:00","breadcrumb":{"@id":"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/ukpostcode.org\/content\/mega-infrastructure-ai-cloud-startup-nscale-raises-155m\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ukpostcode.org\/content\/"},{"@type":"ListItem","position":2,"name":"Mega infrastructure AI-cloud startup Nscale raises $155M"}]},{"@type":"WebSite","@id":"https:\/\/ukpostcode.org\/content\/#website","url":"https:\/\/ukpostcode.org\/content\/","name":"UK News &amp; Updates","description":"UK Post Code","publisher":{"@id":"https:\/\/ukpostcode.org\/content\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ukpostcode.org\/content\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ukpostcode.org\/content\/#organization","name":"UK News &amp; Updates","url":"https:\/\/ukpostcode.org\/content\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/logo\/image\/","url":"https:\/\/ukpostcode.org\/content\/wp-content\/uploads\/2023\/09\/cropped-uk-logo-1.png","contentUrl":"https:\/\/ukpostcode.org\/content\/wp-content\/uploads\/2023\/09\/cropped-uk-logo-1.png","width":307,"height":85,"caption":"UK News &amp; Updates"},"image":{"@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/5529805dee92503827c0c27ed13d55a3","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ukpostcode.org\/content\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/6aac6e3af4be1d6689e924bbaccd84fc0cc6c5f6680490dc6f0a1f09b87d57f1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6aac6e3af4be1d6689e924bbaccd84fc0cc6c5f6680490dc6f0a1f09b87d57f1?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/ukpostcode.org\/content"],"url":"https:\/\/ukpostcode.org\/content\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/posts\/914707","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/comments?post=914707"}],"version-history":[{"count":1,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/posts\/914707\/revisions"}],"predecessor-version":[{"id":914708,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/posts\/914707\/revisions\/914708"}],"wp:attachment":[{"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/media?parent=914707"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/categories?post=914707"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ukpostcode.org\/content\/wp-json\/wp\/v2\/tags?post=914707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}